Page 48 - 1.Table Of Contents.indd
P. 48

Matt Gilbert

                                                       Project Executive


         EDUCATION
         University of Cincinnati
         B.S., Building Construction
         LICENSING
         Florida General Contractor CGC1513535

         YEARS OF EXPERIENCE
         24
         PERCENTAGE OF TIME COMMITMENT
         As needed during preconstruction
         Construction: 50%
         OFFICE LOCATION
         Tampa






        As your Project Executive, Matt is responsible for providing the overall team leadership for the preconstruction and
        construction process with the project stakeholders to ensure all necessary resources are committed to the project, and
        help manage the overall project administration to deliver all contract commitments for the GMP.  He will actively provide
        day to day oversight of the operations of all team members from preconstruction through construction, commissioning
        and project closeout.
        SIMILAR PROJECTS

        MetWest International, Tampa, FL                       Verizon Finance Center, Lake Mary, FL
        275,000 SF, $65 million. Th  is 31+ acre redevelopment in Tampa’s  220,000 SF, $26.15 million. Class A build-to-suit offi  ce building.
        prestigious Westshore District is being developed in multiple  Th  e building sits on a 17-acre site and incorporates site-cast tilt-
        phases. Class A offi  ce spaces totaling 787,500 SF, a 152,000 SF  wall construction with a high-performance curtainwall system and
        executive-level hotel, 75,000 SF in restaurant and retail buildings  punched windows. Th  is project achieved LEED Silver Certifi cation.
        in a village format and a 316,000 SF residential community with
                                                               H. Lee Moffi  t Cancer Center at International Plaza, Tampa, FL
        4,200 additional parking spaces in the form of fl at parking and
                                                               48,000 SF, $10 million. Th  is was a design-build project with Alfonso
        garages. Th  e project’s fi rst phase included the demolition of an
                                                               Architects,  consisted of interior renovations and the exterior expansion
        existing 200,000 SF offi  ce building, site infrastructure; a 230,000-
                                                               of a two-story, 48,000-SF building which houses outpatient medical
        SF, ten-story Class A shell offi  ce building (achieved LEED Gold
                                                               clinics, infusion spaces, advanced imaging, radiation therapy, pharmacy,
        Certifi cation); 7-building restaurant/retail village and two parking
                                                               support space and patient and family waiting rooms.
        garages for over 1,700 cars.
        H. Lee Moffi  t Cancer Center & Research Institute, Tampa, FL  UF Health Medical Offi  ce Building at Springhill, Gainesville, FL
        207,000 SF, $68 million. Provided construction management   48,000 SF, $10 million. Th  is was a design-build project with Alfonso
        services for the new state of-the-art six-story outpatient treatment   Architects,  consisted of interior renovations and the exterior expansion
        facility located on the McKinley Campus in Tampa. Th e facility   of a two-story, 48,000 SF building which houses outpatient medical
        contains outpatient surgery (with associated sterile processing),   clinics, infusion spaces, advanced imaging, radiation therapy, pharmacy,
        four operating rooms, procedure suites, clinics for Moffi  tt’s Breast   support space and patient and family waiting rooms.
        and Cutaneous Departments, as well as imaging, lab and pharmacy
                                                               University of South Florida Health South Pavilion, Tampa, FL
        space, infusion, and clinical research.
                                                               126,000 SF $26 million. Th  is new seven-story, medical offi  ce building
                                                               (MOB) for the University of South Florida was constructed at the
                                                               Tampa General Hospital (TGH) campus on an existing valet parking
                                                               lot area.  Th  e MOB shell construction consisted of a structural steel
                                                               frame with metal stud, densglass and stucco exterior.  Th e lobby
                                                               contains the elevator vestibule, restroom areas and mechanical and
                                                               electrical spaces.  Th  e construction of the interior spaces for this
                                                               project consisted of completing the common and corridor spaces on
                                                               fl oors two through seven. Th  e MOB tenant build-out construction
                                                               consisted of a multi-phased single tenant fi t-out for USF Health.


         USF Health South Pavilion
   43   44   45   46   47   48   49   50   51   52   53