Matt Gilbert
Project Executive
EDUCATION
University of Cincinnati
B.S., Building Construction
LICENSING
Florida General Contractor CGC1513535
YEARS OF EXPERIENCE
24
PERCENTAGE OF TIME COMMITMENT
As needed during preconstruction
Construction: 50%
OFFICE LOCATION
Tampa
As your Project Executive, Matt is responsible for providing the overall team leadership for the preconstruction and
construction process with the project stakeholders to ensure all necessary resources are committed to the project, and
help manage the overall project administration to deliver all contract commitments for the GMP. He will actively provide
day to day oversight of the operations of all team members from preconstruction through construction, commissioning
and project closeout.
SIMILAR PROJECTS
MetWest International, Tampa, FL Verizon Finance Center, Lake Mary, FL
275,000 SF, $65 million. Th is 31+ acre redevelopment in Tampa’s 220,000 SF, $26.15 million. Class A build-to-suit offi ce building.
prestigious Westshore District is being developed in multiple Th e building sits on a 17-acre site and incorporates site-cast tilt-
phases. Class A offi ce spaces totaling 787,500 SF, a 152,000 SF wall construction with a high-performance curtainwall system and
executive-level hotel, 75,000 SF in restaurant and retail buildings punched windows. Th is project achieved LEED Silver Certifi cation.
in a village format and a 316,000 SF residential community with
H. Lee Moffi t Cancer Center at International Plaza, Tampa, FL
4,200 additional parking spaces in the form of fl at parking and
48,000 SF, $10 million. Th is was a design-build project with Alfonso
garages. Th e project’s fi rst phase included the demolition of an
Architects, consisted of interior renovations and the exterior expansion
existing 200,000 SF offi ce building, site infrastructure; a 230,000-
of a two-story, 48,000-SF building which houses outpatient medical
SF, ten-story Class A shell offi ce building (achieved LEED Gold
clinics, infusion spaces, advanced imaging, radiation therapy, pharmacy,
Certifi cation); 7-building restaurant/retail village and two parking
support space and patient and family waiting rooms.
garages for over 1,700 cars.
H. Lee Moffi t Cancer Center & Research Institute, Tampa, FL UF Health Medical Offi ce Building at Springhill, Gainesville, FL
207,000 SF, $68 million. Provided construction management 48,000 SF, $10 million. Th is was a design-build project with Alfonso
services for the new state of-the-art six-story outpatient treatment Architects, consisted of interior renovations and the exterior expansion
facility located on the McKinley Campus in Tampa. Th e facility of a two-story, 48,000 SF building which houses outpatient medical
contains outpatient surgery (with associated sterile processing), clinics, infusion spaces, advanced imaging, radiation therapy, pharmacy,
four operating rooms, procedure suites, clinics for Moffi tt’s Breast support space and patient and family waiting rooms.
and Cutaneous Departments, as well as imaging, lab and pharmacy
University of South Florida Health South Pavilion, Tampa, FL
space, infusion, and clinical research.
126,000 SF $26 million. Th is new seven-story, medical offi ce building
(MOB) for the University of South Florida was constructed at the
Tampa General Hospital (TGH) campus on an existing valet parking
lot area. Th e MOB shell construction consisted of a structural steel
frame with metal stud, densglass and stucco exterior. Th e lobby
contains the elevator vestibule, restroom areas and mechanical and
electrical spaces. Th e construction of the interior spaces for this
project consisted of completing the common and corridor spaces on
fl oors two through seven. Th e MOB tenant build-out construction
consisted of a multi-phased single tenant fi t-out for USF Health.
USF Health South Pavilion