Page 780 - Divyank Tyagi
P. 780
746 | ChaPteR 17 Documenting Your Design
schedule would. You also have the opportunity to change the overall height of the schedule once
it is broken up by grabbing the grips at the bottom of the schedule and dragging up and down
(Figure 17.30). Doing so will draw or push rows from the adjacent schedule portion so that all of
your information is continuous.
Figure 17.29
a schedule’s appearance
can be manipulated when
it is placed on a sheet.
Figure 17.30
changing the schedule
height
To rebuild a split schedule—essentially returning it to a single list—select the schedule on
the sheet so it highlights and the grips are displayed. Click one of the move icons and drag the
split portion on top of the other schedule segment. The split schedule will then become
whole again.
Finishing the Sheet
Now that you have those two views on the sheet, it is a simple matter to add the remaining
views. To add the wall legend you created, you will drag and drop it from the Project Browser in
much the same way you did with the other two views.
In this case, the wall legend came onto the sheet needing little modification. Following
this same workflow, you can also add a drafting view from the imported detail to the sheet,
completing G102 (Figure 17.31).
c17.indd 746 5/3/2014 11:46:32 AM

