Page 35 - Defence Wing Booklet
P. 35
(a) The TDW examines the GOI Questionnaire and scrutinizes the
followings:
i. Details of the sampled mandatory respondents. If the exporter’s
names are not provided in the questionnaire, TDW requests the
IAs to provide the names of the mandatory exporters, who are
required to participate in the investigation,
ii. The Period of Investigation (POI),
iii. HS Code,
iv. Due date to le the response,
v. Procedures/ instructions for ling the response.
(b) After ensuring the above, the concerned EPCs are requested to
coordinate with mandatory respondents/ producers to provide details
of IEC & PAN of the mandatory respondents and their crossed-owned
companies. Further, EPCs are requested to conrm the SION, HS
Code, the location of the manufacturing units of the mandatory
respondents and the nodal contact person in the company of the
mandatory respondent. EPC provides these details within 2-days of
the receipt of a request from TDW.
(c) The TDW requests mandatory respondents to provide the list of
Schemes for which they have availed or received authorizations/ or
assistance. If the companies have not availed any of the schemes, the
GOI in its response only provides the brief on those schemes to IAs.
(d) After receiving the company specic details, TDW instructs the Legal
Counsel to prepare the draft response with specic legal arguments
pertaining to the schemes mentioned in the Questionnaire.
(e) TDW requests all concerned Ministries/Departments of GOI and the
State Governments, responsible for administering the schemes to
provide the response for scheme specic questions and company-
specic information i.e. the assistance or authorisations received by
the mandatory respondents during the POI and Average Useful Life
(AUL), (action at (c), (d) & (e) initiated simultaneously).
25