DESIGN GUIDELINES


                        EFFECTIVELY COMMUNICATING WITH YOUR DESIGN TEAM

                       The following information summarizes the best practices to be incorporated into the design execution of our
                       large scale and complex projects, including design-build and EPC engagements. The information below makes
                       reference to other documents which can be found in the Architectural and Engineering Quality Plans, Design
                       Project Management Playbook and/or the Operations Procedures Guide. These Guidelines consolidate the best
                       practices into a concise format for quick reference throughout the project duration. Executing a large scale
                       project requires an amplified focus on the fundamentals of Design Execution and includes the following:

                         1    DEFINED PROJECT SCOPE


                              This needs to be updated as the project develops and must include an adequate programming
                              phase at the start of the engagement to ensure all scopes are properly addressed.

                         2    DEFINED BASIS OF DESIGN CRITERIA


                              This should be updated as the project develops and maintained as a reference document.

                         3    DEFINED SCOPE OF SERVICES


                              This needs to be updated as the project develops and maintained as a reference document.

                         4    DEFINED DESIGN KEY DATE SCHEDULE


                              This is integrated with the overall project schedule and with careful consideration to the complexities
                              and magnitude of the project while acknowledging the sequence of design activities executed by the
                              process, packaging and facilities teams. The design schedule needs to include document issuance
                              target dates for review, pricing, procurement, permitting and construction for each scope.


                         5    DEFINED ROLES + RESPONSIBILITIES

                                 ◆  Project Organization Chart that includes an overall Design
                                  Leader and Design Integrator (for EPC projects).
                                 ◆  Communications Plan – define who has the authority to make decisions.
                                 ◆  Dedicated staff with the best available resources appropriate for the scope and complexity
                                  of the project including Subject Matter Experts who can help drive major decisions. A larger
                                  team with additional resources in each design discipline needs to be carefully considered.

                                                                                           ENGINEER, PROCURE,
                                       FACILITY                 MANUFACTURING
                                  ORGANIZATION CHART          ORGANIZATION CHART             CONSTRUCT (EPC)
                                                                                           ORGANIZATION CHART
                                 DESIGN MANAGER               ENGINEERING                 PROJECT DESIGN
                                                              MANAGER
                                                                                          MANAGER*
                                  ARCHITECTURE                 PROCESS ENGINEERING         ENGINEERING MANAGER
                                  CIVIL ENGINEERING            PACKAGING ENGINEERING       DESIGN MANAGER
                                  STRUCTURAL ENGINEERING       CONTROLS ENGINEERING
                                                                                           *Project Design Manager is usually
                                  MECHANICAL ENGINEERING                                   either a Design Manager or
                                                                                           an Engineering Manager.
                                  ELECTRICAL ENGINEERING
                                  DESIGN CONSULTANTS
        14                                                                               MEGA PROJECTS PLAYBOOK | 2021
                                CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION.  FOR INTERNAL HASKELL USE ONLY.
   12   13   14   15   16   17   18   19   20   21   22