Page 20 - Megaprojects Playbook
P. 20
ESTIMATE CLASSIFICATIONS
CLASS CLASS 5 CLASS 4 CLASS 3 CLASS 2 CLASS 1
Cost History/ Substantially
Verbal Conceptual AE Design
Description Parametric/ Complete
Description Design Development
Study Design
Permit Issue or
1 Floor Plan + >1 Drawing per 30-90%
Design --- Construction
Basis of Design Discipline Drawings
Issue
DESIGN/ESTIMATE FUNNEL
20%
15%
10%
5%
DESIGN
VARIABILITY
ACTUAL
COST
ESTIMATE
VARIABILITY
15% 5%
25%
30%
PHASE 1 PHASE 2 PHASE 3 PHASE 4
(CLASS IV) (CLASS III) (CLASS II) (CLASS I)
Rough Order Conceptual Preliminary Detailed
of Magnitude Project Plan Design Design Plan
Cost Accuracy Cost Accuracy Cost Accuracy Cost Accuracy
+50% to -30% +40% to -20% +25% to -15% +10% to -10%
PROCESS ESTIMATING PHASES
CLASS CLASS 5 CLASS 4 CLASS 3 CLASS 2 CLASS 1
Substantially
Basis of Design Preliminary 50% Complete Locked Locked
Complete
Substantially
Equipment List Conceptual Preliminary 50% Complete Locked
Complete
Substantially
Process Flow Conceptual Preliminary 50% Complete Locked
Complete
Substantially
Floor Plan --- Preliminary 50% Complete Locked
Complete
Substantially
P&IDs --- Conceptual Preliminary 50% Complete
Complete
Estimate Classifications allow the team to have the same expectations for
design progress and corresponding estimate accuracy.
HASKELL | WE CREATE THINGS THAT MATTER 17