                     Multi-disciplinary scope (facility, process, utilities & packaging) means we were responsible for the ripple
                     effects of changes between the scopes. When Haskell does not own the total scope, a variance to a piece of
                     packaging equipment (example: foundation or utility load) is passed back to the owner as a change order when
                     the change becomes known. When Haskell owns the total scope we're responsible for all of these variances
                     inside of our contract value, because we've committed to a GMP that incorporates contingency to manage all
                     of these changes. Consider phased GMPs by scope of work based on design completion. Adapt contingency                                                        Process Development
                                                                                                                                                                                    Relay, Maryland
                     to adequately address the risk of unforeseen changes that would not come through as a contract
                     change. Determine the appropriate levels by a risk review based on the level of scope completeness.

                     OWNER ASSIGNMENT

                     When Haskell agrees to incorporate equipment previously purchased by the client in our contract scope, we take on
                                                                                                                                              DESIGN/ENGINEERING                PROJECT MANAGEMENT                  PROGRAM RESOURCES
                     all risks of outcome even if we weren't initially responsible for the error. The Brenton Case packer was an unproven
                     technology for the application. It was selected and purchased initially by Diageo. We accepted the equipment into       project principal plainfield         senior project manager              program executive
                     our contract, but advised that there was a high risk (both likelihood and impact) that the technology wouldn't              Peter Skirbst, AIA                  Matt Lantzy                       John-Paul Saenz
                     work. The technology indeed did not work. However, because we accepted the scope inside of our contract we                  project principal                                                    program director
                     were responsible to make the necessary modifications and repairs, which resulted in high costs and ultimately               David Kode, AIA                                                        Tom Van Ness
                                                                                                                                                                                  EXECUTIVE STAFF
                     damaged our reputation. Only accept assignment of owner purchased equipment if you can carve the risk out                 process + utilities lead                                             director of construction
                     of the contract and/or have an opportunity to validate that it is the right application for our scope of work.            Barnum Mechanical, Inc               project manager                     Jerry Langford
                                                                                                                                                                                     Anthony White
                                                                                                                                                 packaging lead                                                     director of procurement
                                                                                                                                                  Tom Van Ness                    construction manager                  Jonathan Toke
                                                                                                                                                                                      Tim Coons
                                                                                                                                                project architect
                                                                                                                                                                                  field project manager
                                                                                                                                                  Daniel Aguilera
                                                                                                                                               Amber Edington, LEED AP               Matthew Craft
                                                                                                                                                 civil engineering                 quality assurance
                                                                                                                                                  GW Stephens                        coordinator
                                                                                                                                                **Mike Wheeler, PE
                                                                                                                                                                                    Michael Wittmann
                                                                                                                                               structural engineering             field project manager
                                                                                                                                                  Joe Watson, PE
                                                                                                                                                                                     Chris Callura
                                                                                                                                              mechanical engineering            Project Manager Packaging
                                                                                                                                                 Dana Helman, PE                     Jeremy Triplett
                                                                                                                                               electrical engineering
                                                                                                                                                 Gerry Lukach, PE
                                                                                                                                                landscape architect               Trade Subcontractors
                                                                                                                                                  GW Stephens
                                                                                                                                                **Erick Lycke, ASLA

























                                                                                                                                                                                                                                **Haskell Peer Review Team
        HASKELL | WE CREATE THINGS THAT MATTER                                                                                                                                                                                               47
   47   48   49   50   51   52   53   54   55   56   57