Page 17 - Manual LEF
P. 17

Handling and Storage             This extracting and filtering unit is designed for upright transport.

                                                For easy transportation the device is equipped with castors.

                                                Warning:
                                                Keep the following conditions for handling and storage:
                                                Temperature:                 -25 °C to +55 °C
                                                Short-time value (max. 24 hrs.):  up to +70 °C
                                                Air humidity:                 not condensing
               Installation

                   Mechanical Installation
                                                Prior  to  commence  installation  please  check  this  unit  for  any
                                                possible transport damages.
                                                The extraction unit has to be installed on level, horizontal and solid
                                                ground.
                                                After moving the device to its destined place the levelling feet must
                                                be  screwed  down  to  lift  the castors  off the ground.  Unscrew  the
                                                levelling feet on the upper nut until the device is evened out. Now
                                                screw the nut in the upper direction and fasten it at the machine
                                                housing.





















                                                To  other  machines,  devices  and  parts  of  the  building  minimum
                                                distances have to be met to ensure save maintenance works.
                                                Following minimum distances have to be met:
                                                     Frontside:         + 0,8 m
                                                     Left and right side: + 0,1 m
                     Electrical Connection
                                                The extraction unit is provided with complete electric equipment.
                                                The corresponding connection values can be found in the chapter
                                                “Technical Specifications” and in the circuit diagrams.
                                                Please note:
                                                The interfaces are only intended for installation and dismantling of
                                                the system. They may not be disconnected under load.



                     ACD TD - issue 09/2017                                                             page 15
   12   13   14   15   16   17   18   19   20   21   22