3. Good Works done by TRD/SC during the year 2020-21( Till Date)
Energisation of Chittinad Cement Siding at TDU:
Energisation of newly erected Tramway OHE of 20.50 TKM (13.027 RKM) done on
01.10.2021 after duly obtaining the EIG sanction with EIG sanction number 2110042,
Dated : 29.10.2021. The siding line is taking off from CCI line in TDU-CCI line of SC
division. With this all the Diesel loco’s used will be phased out.
Fig: Chittinad Cement Siding.
Energisation of By-pass line at MTMI:
Energisation of by-pass line OHE connecting mainline at KZJ end in BKL-MTMI section
to MTMI-JNPD branch line of 2.10 TKM done on 05.09.2021, after duly obtaining the
EIG sanction with EIG sanction no. 2106007, dated:03.06.2021 which will avoid the
loco reversal at MTMI.
Fig: NI working at MTMI by-Pass
Electrification of new loading line at ZN yard:
New loading line of 117 Mts laid at ZN yard for easing the loading activities. The
electrification for new line with tramway OHE Done by TrD.
Fig : New line electrification work at ZN yard