3.  Good Works done by TRD/SC during the year 2020-21( Till Date)

             Energisation of Chittinad Cement Siding at TDU:

              Energisation  of  newly  erected  Tramway  OHE  of  20.50  TKM  (13.027  RKM)  done  on
              01.10.2021 after duly obtaining the EIG sanction with EIG sanction number 2110042,
              Dated : 29.10.2021.  The siding line is taking off from  CCI line in TDU-CCI line of SC
              division. With this all the Diesel loco’s used will be phased out.


                                           Fig:  Chittinad Cement Siding.










             Energisation of By-pass line at MTMI:

              Energisation of by-pass line OHE connecting mainline at KZJ end in BKL-MTMI section

              to MTMI-JNPD branch line of 2.10 TKM done on 05.09.2021, after duly obtaining the
              EIG sanction with EIG sanction no. 2106007, dated:03.06.2021 which will avoid  the
              loco reversal at MTMI.








                                          Fig:  NI working at MTMI by-Pass
             Electrification of new loading line at ZN yard:

              New loading line of 117 Mts laid at ZN yard for easing the loading activities. The
              electrification for new line with tramway OHE Done by TrD.










                                            Fig : New line electrification work at ZN yard