Fig: New Capacitor bank at KZJ               Fig: New capacitor bank at  JMKT/TSS
            Electrification of 685 mts of new line at GDK siding:


              As per the request from siding authorities for 685 mts of new line with electrification
              for  easing  the  loading  activities  at  GDK  siding,  the  works  related  to  TRD  are
              completed.











                                                 Fig: GDK siding LOP

             Provision of DJ STOP boards  for 16 car MEMU @DKJ and SEM:

                New 16 car MEMU services in place of 12 car MEMU are introduced between BDCR-
              SRUR and SC-WD from 19/20.07.2021. New DJ Close boards are provided at WD and
              KRA SSPs with suitable length for 16 car MEMU to avoid the bridging of supply.










                                                Fig: DJ Closed bords for 16 car MEMU.
             Replacement of NICCO make contact wire:

              NICCO make contact wire is a failure prone contact wire and replacement of the
              same  is  the  foremost  work  to  do  for  TRD  in  the  Division  to  avert  the  breakdowns.
              Division has taken up the work and replacing in full pace from last two years. There
              are Total 197 TLs identified for replacement. so far. 37 TLs (47387 Mts) of contact wire
              replaced.