replacement of rusted Anti Creep wires. Total 33 rusted Anti creep wires are
replaced.
Fig: Replacement of rusted ACC
Replacement of Rusted cantilevers:
Rusted cantilevers are the one of the causes for breakdowns in polluted areas. Due
to the rusting of the rusting of the cantilever tubes, the mechanical strength of the
cantilever will decreases drastically and leads to breakdown of OHE. To avert the
failures due to rusting of cantilevers, replacement work has taken up and replaced
911 No’s in pollution prone areas.
Fig: Rusted cantilever and replacement.
Adjustment of contact wire height @ RD-6 in SC yard:
To facilitate the provision for running of over dimentioned consignment (ODC), the
contact wire height at road-6 in SC was incresed from 5 mts to 5.46 mts. as the
existing- less height FOB was dismatled by engineering department.
Fig: Height adjustment work.
Replacement of Isolators and Jumpers:
As per the Railway Board and Headquarters guide lines, all the 800 Amps Isolators
and Isolator jumpers in the Main line should replaced with 1250 Amps and 160 Sq.
mm Jumpers respectively for increasing the section speed between BPQ-KI to 160
KMPH.