Page 16 - TRD
P. 16

Fig: Isolator replacement at KZJ Section.

            Relocation of AT @ 479/24:


              As the existing IB signal is shifted by the signal department by one kilometre
              from 478 to 479 Km, the corresponding AT also relocated location no. 479/24
              to facilitate the power supply  for AT by erecting the new K-150 mast.








                                                       Fig: Relocation of AT


             Relocation of OHE masts between NPL-LP:

              The new underground Hyderabad metro water pipe line is planned between NPL-LP
              by  state  government  authorities,  which  has  to  crass  the  railway  track  between
              above said stations. For  this  work  4 OHE  mast  to be relocated for passage of the
              pipeline. The relocation work was completed by erecting new B-150 masts.











                                               Fig: Erection of masts.

             Provision of cleats:

              There  was  a  case  on  18.11.19,  Structure  bond
              getting  entangled  with  foot  board  of  coach  at
              GUU  station.  A  special  Drive  was  launched  to
              ensure  the  all  structure  bonds  at  platforms  for
              properly  dressing  and  availability  of  cleats  on
              vertical  wall  portion.  New  Cleats  has  been
              provided  and  all  other  structure  bonds  were
   11   12   13   14   15   16   17   18   19   20   21