Page 16 - TRD
P. 16
Fig: Isolator replacement at KZJ Section.
Relocation of AT @ 479/24:
As the existing IB signal is shifted by the signal department by one kilometre
from 478 to 479 Km, the corresponding AT also relocated location no. 479/24
to facilitate the power supply for AT by erecting the new K-150 mast.
Fig: Relocation of AT
Relocation of OHE masts between NPL-LP:
The new underground Hyderabad metro water pipe line is planned between NPL-LP
by state government authorities, which has to crass the railway track between
above said stations. For this work 4 OHE mast to be relocated for passage of the
pipeline. The relocation work was completed by erecting new B-150 masts.
Fig: Erection of masts.
Provision of cleats:
There was a case on 18.11.19, Structure bond
getting entangled with foot board of coach at
GUU station. A special Drive was launched to
ensure the all structure bonds at platforms for
properly dressing and availability of cleats on
vertical wall portion. New Cleats has been
provided and all other structure bonds were