Page 34 - ENGINEERING
P. 34

In  addition  to  this,  another  goods  loading  platform  is  under
                        development at Metpally station with WBM surface. This is targetted to
                        be  commissioned  in  December  2021.  The  likely  investment  for
                        developing this Goods shed is Rs.80 Lakhs and it is expected that 50 to
                        60 no. of rakes per year of food grains (outward) / fertilizers (inward)
                        will be handled in this Goods shed after development. Apart from the

                        above  soft  upgrades  at  various  goods  loading  stations,  another
                        model goods shed was developed at Khammam station on Kazipet-
                        Vijayawada  section  duly  providing  resting  shed,  BT  surfacing,
                        improved  lighting  etc.,    Similarly,  goods  loading  platforms  at
                        Zaheerabad and Udgir on Vikarabad-Parli Vaijnath section were also
                        developed  to  tap  non-traditional  freight  basket.  By  doing  these  soft
                        upgrades/  improvements  total  revenue  of  Rs.  263  Crores  was

                        generated in these sections.

               2.1.15.  INSTALLATION OF CENTRALIZED OXYGEN GAS PIPE LINE SYSTEM AT KZJ
                    COVID CENTER:
                      Centralized  Oxygen gas  pipeline  system  has  been  installed  at  Kazipet
                    Covid-19 center. 60 oxygen beds at STC & 60 beds at KZJ installed in a
                    record time of 30 days.