2.1.19.  GOODS SIDING WORK AT ZN:

                      The following works were taken up at ZN goods siding during the block
                      time of 20 days.
                      Dismantling of old Goods line.
                      Slewing and lifting of Line No. 1 as Track machine siding.
                      Laying of 1 new point.
                      Shifting of 3 nos of OHE Masts.
                      Laying  of  New  Goods  lines  -  2  lines  of  CSR  lengths  344m  and  444m
                      respectively.
                      Laying of WBM between line No. 2 and 3 for goods loading platform.
                      Concrete  Pathway  of  150  m  length  for  Track  machine  siding  for
                      machine maintenance.
                      Provided Pre cast RCC slabs for newly developed open drain in siding
                      to ensure no water logging.











               2.1.20.  INAUGURATION OF TRACK MACHINE SATTELITE DEPOT:

                      Satellite depot at KZJ station has been completed and inaugurated by
                      PCE/SCR.  Additional  machines  like  HOBCM,  dynamic  3X  etc  are
                      getting added year by year but the available infrastructure is only one
                      line  for  track  maintenance  ,  IOH,  stabling,  small  shed  etc.  are  grossly
                      inadequate  to  cater  demand,  thereby  it  is  forced  to  send  track
                      machines  to  Rayanapadu  depot.  When  more  than  one  machine
                      comes for maintenance there is no line/ track , hence there is need to
                      augment capacity. In view of this, above laying of new STMD lines and
                      repairs to old STMD lines at KZJ yard has been done.