for loading. Three tower lights have also been provided to improve the
                       illumination  levels.  For  improvement  of  Goods  shed  an  investment  of
                       Rs.35 Lakhs was done which has improved the utilisation of Goods shed

                       effectively.  A total of 83 rakes were loaded and Rs.28.2 Crores were
                       earned during the period September 2020 to August 2021.













                                      BEFORE                                   AFTER














                                     BEFORE                                    AFTER

               KARIMNAGAR:


                       Karimnagar  is  an  important  goods  loading  point  and  district
                       headquarters station. It mainly deals with loading/ unloading Granite,
                       Fertilizers and Food grains. Out of full length 700 mts loading platform,
                       concrete  surfacing  was  available  only  for  350  M  length.  Customers
                       were  frequently  complaining  regarding  non-availability  of  proper
                       surfacing for the balance 350 M length. The balance 350 M length of

                       platform  was  improved  with  concrete  surfacing  to  facilitate  easy
                       movement of heavy trucks. Now the total  size of the platform i.e 25 x
                       700  Mtrs  is  available  with  concrete  surfacing.  For  improvement  of
                       Goods  shed  an  investment  of  Rs.120  Lakhs  was  done  which  has
                       improved the utilisation of Goods shed effectively.  A total of 404 rakes
                       were  loaded  and  Rs.120.3  Crores  were  earned  during  the  period
                       September 2020 to August 2021. Presently, this goods shed is handling
                       more than 1MT of traffic anually.