2.1.13.  SEWAGE TREATMENT PLANT AT KZJ:
                      Sewage treatment plant has been provided at KZJ station.













               2.1.14.  GOODS LOADING PLATFORM:

                       For  capturing  this  traffic  through  rail  network,  development  of  proper
                       infrastructure  is  must.  As  many  as  eight  Goods  Sheds  were  identified
                       and  developed  in  Kazipet-Peddapalli  and  Peddapalli-Lingampet  -
                       Jagtiyal sections by doing soft upgrades. The Goods Sheds identified in
                       Kazipet-Peddapalli section are Hasanparthy, Oppal, Peddapalli and in
                       Peddepalli-Lingampet  Jagtial  section  are  Sultanabad,  Karimnagar,

                       Gangadhara, Lingampet Jagtiyal & Metpalli

                       The identified soft upgrades includes  improvement of approach road,
                       provision  of  Resting  sheds  for  hamalies,  widening  of  existing  loading
                       platforms,  drainage  improvements,  improvement  of  illumination,
                       development  of  greenery  etc.  At  these  stations,  based  on  the
                       commodity to be loaded, PF surface has been decided to optimise the

                       expenditure to be incurred.  For heavy loading and unloading points,
                       concrete  pathway  has  been  planned  and  for  the  locations  where
                       granite loading is perceived, macadam road has been adopted.  At
                       two  stations,  loading  surface  has  been  improved  duly  providing
                       released  PSC  sleeper  matting.  Despite  the  prevailing  severe  Covid
                       pandemic  conditions,  all  these  minimum  infrastructure  works  were
                       completed within a record time of less than one year.

               PEDDAPALLI:


                       Peddapalli      is   District   Head     Quarters     station    .   The     main
                       loading/unloading  activities  are  Food  grains/Fertilizers.  The  old  goods
                       loading  platform  surface  was  WBM  with  full  of  pot  holes  with  poor
                       drainage conditions.The trucks were unable to move through the pot
                       holes. The truck operators, labour, FCI officials, loading agencies were