bitterly  complaining  about  the  condition  of  the  loading  platform
                       surface.  Loading  activities  were  hampered    in  rainy  season  with  the
                       existing  condition  of  platform  surface.  Now  the  surfacing  has  been

                       improved  with  WBM  surface  &  power  roller  compaction.  Concreting
                       surfacing has also been  provided for full length of 700mts and 25 mts
                       width along with side drains are provided on main line side to facilitate
                       drainage.New  resting shed  for  hamalie of  size    16.0  x  8.0m  and  toilet
                       block  of size  4.0 x 8.0m has also been  constructed in addition to the
                       old  Hamali  shed.  Vitrified  tile  flooring  is  provided  inside  the  hall  and
                       granite seating benches are provided. 3 Nos of latrines, 6 nos of Urinals,
                       5  nos  of  taps  were  provided  In  the  toilet  block.  Improvements  have

                       been done to the existing resting shed and plantation was  also done
                       infront  of  building  to  make  the  goods  loading  area  eco  friendly.  For
                       improvement of Goods shed an investment of Rs.278 Lakhs was done which
                       has  improved  the  utilisation  of  Goods  shed  effectively.    A  total  of  82  rakes
                       were loaded and Rs.24.4 Crores were earned during the period September
                       2020 to August 2021.













                                        BEFORE                                     AFTER














                                           AFTER                                                                   AFTER

                    UPPAL:

                       OPL  Railway  station  is  an  important  station  on  KZJ  –  BPQ  section  of
                       South-Central Railway. Transportation of coal, granite and food grains
                       will  be  taking  place  from  a  dedicated  siding  line.  Due  to  the