EMU CAR SHED , MOULA-ALI
1.Introduction of 3- Phase EMU Rakes:
New 3- Phase 12 Car rakes were inducted into service for passenger traffic w.e.f 01.05.2019.
The existing 09- Car Rakes were augmented to 12 Car rakes and inducted into service w.e.f
05.05.2019, thereby all the 10 Rakes of MMTS trains in the existing routes SC-LPI-HYB-FM
are augmented from 09 car to 12 Car and kept into service.
12- Car 3- Phase & EMU (MMTS) Rakes
2.Trouble shooting Directory (TSD) for 3-Phase EMU:
Trouble shooting Directory for 3-Phase EMU was Unveiled by ADRM/O and ADRM/I in
presence of all BOs at DRMs Conference Hall of Hyderabad Division on 18.06.2019. This will
facilitate LPs for Quick Trouble shooting of 3- Phase EMUs on line.
3. Audio & Visual system to warn staff working in Pit lines
All the 03 Pit lines of Inspection shed are provided with Hooter (Electronic Buzzer) & Bulb
indication arrangement for alerting the maintenance staff working in the pit lines during
Movement & Dispatch of Schedule Rakes.
Bulb indication arrangement Electronic Buzzer (Hooter)