                           100 – GENERAL REQUIREMENTS

                           Design

                                  Provide necessary design, documentation and working drawings, prepared by qualified
                                  and registered professionals for the following disciplines.

                                             Architectural
                                             Soils inspection/reporting
                                             Site Services, drainage.
                                             Structural concrete, masonry, wood and steel framing.
                                             Mechanical, plumbing and HVAC.
                                             Electrical.
                                             Landscaping
                                             *Independent testing, inspection and review consultant.

                                         * Owner and Design-Builder to mutually agree on appointment of all or any
                                         Independent Consultants.


                           Work and/or Materials  not included in our Proposal

                               Building Permit fees, imposts or any costs associated with land development.
                               Rock excavation, blasting or unusual sub-grade soil/water conditions.
                               Building interior/exterior signs.
                               Window dressings, blinds, drapes etc.
                               Winter construction costs.
                               Furnishings, lockers, furniture etc.
                               Water treatment appliances or filters.
                               Independent consultant review fees.






                                      .