                                                      ❖ A brief overview of the project

                                                          Project Details: Optimization of Truck Loadability in K2
                                                          Shipments for Snacks and Noodles

                                                             Achievements:

                                                             1.  Implementation of Excel Based Tool improved
                                                                 Loadability by 2.5 % (Cost saving of nearly 4 Cr/Year)
                                                             2.  Redesigned CFC improved Loadability and saved
                                                                 nearly 4.5 Cr/Year in Raw Material + Loading costs


                                                      ❖ How is a normal day at the Internship?

                                                      I interned at ITC Foods Limited Bangalore Division; there I was
           THORAT GANESH VIJAY                        part of the Production Planning team. My day usually started by

                                                      reaching to office at 9 AM, then I used to review my pending
                            ITC                        works and plan the day ahead. Once it’s over; I used to meet
       __________________________________________     my guide and discuss next course of action (whether to do the

         GENERAL INFORMATION                          data analysis, calling the stakeholders or visit the manufacturing
                                                      plants as per the need). Throughout the day I tried to talk to
           Batch: PGDIE 48                            NITIE seniors and my team members regarding the challenges I
                                                      was facing and used to take their suggestions. To capitalize on
           Stream: Mechanical                         free time my guide may get in the evening, I used to stay up
                                                      late in office.
           Work Ex: KSB Pumps Ltd,
                                                      Sometimes I had to visit the plants for few days, then there I
                             Dar Al Handasah          used to spend my time recording the current practices. After
                                                      brainstorming, I used to discuss the problems and possible

                                                      solutions with the stakeholders at the plant.


       ❖ What are the challenges faced during Internship?

          1. Understanding the project scope and aligning the stakeholders with the common objective points

          2. Collecting the right and relevant data for the project


          3. Finding the out of the box ideas to address the problem statement

          4. Maintaining the higher confidence regarding the outcome of the work

          5. Optimum use of time given by the guide/ other seniors to make most out of it.



       ❖ What did you do right and what did you do wrong?


          Right:

              1.  I was able to align all stakeholders with the objectives of the project and their expectations from it.



       96 | P a g e                                                                                                                                               T a t v a   1 2