       PPO Diaries


                                                       ❖ A brief overview of the project
                                                       •  Topic-Packing  optimization  study  of  OSD(Oral  Solid
                                                          Dosage), sterile and MDI(Metered Dosage Inhalers) units.
                                                       •  Deliverable - Optimization of Manpower requirement in
                                                          OSD(Oral Solid Dosage), Sterile and MDI (Metered Dosage
                                                          Inhalers) units’ line wise/product wise/Family wise.
                                                       •  References - further to work done by T B Banerjee on the
                                                          same topic in Goa Site.

                                                       ❖ How is a normal day at the Internship?

                                                       Cipla Goa Site has 10 plants also known as Units of which are

                                                       of  OSD,  1 of MDI  and  3  of  Sterile  Products.  This  Facility is
                                                       totally dedicated to export.
            JAMDADE PRUTHVIRAJ
                                                       Normal day used to be like

                         CIPLA                         •  8:30 - Reaching to site from 14 kms away where everyday
                                                          Security guards used to observe my punctuality.
         ________________________________________
                                                       •  Around 9 - Discussion with project manager about project
          GENERAL INFORMATION                             status and further proceedings.
                                                       •  10-12  -  Completing  pending  work  and  preparing  for
                 Batch: PGDMM 05                          further work as per Project managers discussion.
                                                       •  One hour for lunch
         B.Tech: Guru Ghasidas Central                 •  Around 13:30 PM -Going to other units for Data collection
                                                          and meetings with unit heads and weekly meet with Site
                University, Bilaspur                      head(Project Owner).
                                                       •  17:00 to 19:00 - Sorting and Analysis of gathered Data.
                Stream: Mechanical                     •  Leaving the site around 19:30 or 20:00 followed by dinner
                                                          and immediate sleep.
                  Work Ex: Fresher



       ❖ What are the challenges faced during Internship?


       •  Firstly, my project was totally HR based and what to apply from SCM and Operations perspective to achieve
          better results was major challenge.

       •  Being a non-pharma guy, the process used to seem complicated to understand. Dealing with Manpower
          for project related to manpower optimization.
       •  Convincing heads about the proposed solution and applying it practically.



       ❖ What did you do right and what did you do wrong?

       •  Firstly, there was nothing right or wrong in internship because everyone used to treat me as student
          and even
       •  if I did mistake, I used to rectify it asap. But some etiquettes that I followed were:

       •  Thinking internship as an opportunity to learn and do work in whatever aspect I can to increase the

          versatility of results.