Case 6                               Date: 28.12.2018                      Time: 11:00 hrs.



             Incident

            Benzene loading bay no. 2 Benzene Tanker no. UP15DT4033 was fully loaded with 25410 Kgs of Benzene.
            During disconnection of the loading arm Benzene started leaking from the tanker flange (manifold valves).
            It was observed that Benzene was coming out from the manifold flange even after all the manifold valves
           were  found  in  fully  closed  condition. Immediately  master  valve  was  closed  but  leakage  of  benzene
           continued due to passing of manifold valves & master valve. Finally leakage was arrested by removing
           loading arm and putting end blind & situation brought under control.


             Root Cause

            1. Inefficient tankers checking system.
            2. Passing isolation valves (Manifold and master).
            3. Passing of the compartments.
            4. No view glass to check complete draining.
                                                                             Isolation valve in close loop
                                                                                 draining system



                                                            Tanker Valve manifold


                                                                                                Close loop draining
                                                                                                 system to Close
                                                                                                blowdown vessel


                                                              Actual Site Photo of Draining assembly for Benzene Tanker



             Recommendations

           1.  Tanker's overall checking system should be strengthened to ensure thorough healthiness of the tankers
              before sending the tankers for loading at Gantry.


            2.   Marketing to ensure complete inspection of Master valves & Manifold valves by water filling / Hydro
               test or by some other means and ensure NIL passing of i/vs before issuing Green cards for the tankers.

            3.   Passing of the compartments shall be checked at some fixed intervals and same shall be recorded and
               shared with Gantry operation.


            4.  View glass shall be provided in the draining hose assembly to ensure completeness of the residual liquid
               draining from the loading arm.