Case 18                              Date: 27.07.2020                      Time: 12:00 hrs.



             Incident

            Field in-charge, Sh. Chandra Prakash (PNM) was on normal plant round in NCU. Suddenly one tin sheet of CGC
            shed fallen from the height of almost 50-60 ft just near him when he was in CGC Compressor area.

































             Root Cause

            1. Loosening of rivets due to wind over a period of time.
            2. Corrosion over a period of time and detachment of percolated roof sheet due to heavy wind.

            3. Identification of corroded loose sheet went un-noticed.


             Recommendations

            1. Loose hanging corroded sheet of CGC is to be removed.
            2. Corroded and hanging roof sheet to be replaced all across the PNC.





             Case 19                              Date: 08.07.2020                      Time: 10:00 hrs.



             Incident

            Contractor employee (Satish Electrician) engaged in elect maint of NCU observed spark with sound near the
            terminal of outdoor type capacitor bank reactor installed at back of S/S#1. He immediately raised a fire call by
            activating MCP NO. 101-L11-127 & 101-L5-10 near Substation # 1 (NCU). Immediately 1st turnout with crew
            rushed to the spot. On arrival there was no fire observed in the capacitor bank#1 - 1204 KVAR (6.6KV). Some
            motors of AU had tripped during the incident and were restarted immediately.