Case 17                              Date: 05.07.2020                      Time: 03:00 hrs.



             Incident

            Due to heavy thunderstorm one wind sock installed at roof of MCR(Main Control Room) building fell down
            on ground floor walkway . Fortunately no one was moving on walk way during this incident.





































             Root Cause

            1.   Weak  structure of wind sock.
            1.1  Rod bracing was not proper.
            1.2  Wind sock structure Rod height was slight higher than normal.

            2.   Heavy thunderstorm (Natural calamity).



             Recommendations

            1. Wind sock structure to be strengthen - Rod height to be reduced and bracing to be done to strength the
                structure against wind.
            2. Wind sock survey across all units to be done for checking any similar abnormality.

            3. Diameter and Height of pole to be standard.