Incident













                                                                                      Chain pulley block:
                                                                                      thru which pipe was
                                   ĈĆ  ŐÒŐÑ NÑÒŌŊ                                     being pulled in
                                    erected                                           piperack






                                                                              J ÑN Ĭ ÕÒŌŊÈ RǾMŐŐÑŇ ŎŌ POÑ
                                                                              pipe prevented direct
                                                                              contact of damaged cable
                                        ĊBD ŃŎǾÑ ŐŎRÑǾŃMNÕÑ ŊŎPŃǾÞÖŐÕÑŇ ÒŌ


                                            between pipe and beam


             Root Cause

            Improper laying & dressing of power cable & Inadequate supervision during erection of pipe



             Recommendations

           1. Before erection of new facility, surrounding area to be checked and made clear of any cables, materials,
              scraps etc.
            2.  For carrying out critical erection jobs, job safety analysis shall be carried out to find the possible hazards
              involved in the job and their counter safety measures to be adopted.
            3. Cables shall not be laid in areas where piping erection is to be done. All HT electrical cables laid in
              Prime-G to be dressed up properly.

            4. Separate work permits to be issued / obtained for specific job.




             Case 5                               Date: 10.08.2019                       Time: 17:00 hrs.



             Incident

            During unloading of acetic acid from the Tanker, driver received superficial burn injury at back and shoulder
            due  to  spillage  of  acetic  acid  on  him  during  fitting  of  metallic  hose  in  tanker  valve  assembly.  He  was
            administered First aid at First aid centre and release thereafter