Page 24 - McD_ROTF DRAINAGE & PIPED SERVICES_Neat
P. 24

Drainage & Piped Services Standard Specification
Version 2014-1

             no cost to the Client providing that the Contractor is not required to correct any defect
             due to normal wear and operation.

             The Contractor shall be required to provide a fully detailed written report to the Project
             Manager of each and every such defect together with the remedial works undertaken
             within seven days of such remedial works.

1.2.47 Public Health

             The Contractor is to supply, install and provide 'as installed' record drawings and
             operation & maintenance manuals, commission and demonstrate as applicable, all the
             necessary materials, components and equipment to form a complete working
             installation at the premises in accordance with all relevant British and European
             Standards. The completed installation, new and existing services adapted as part of the
             contract are to be fully in accordance with all relevant BS/EN Regulations and local
             authority requirements.

             The Contractor is to be responsible for identifying and making suitable provision for,
             the mechanical characteristics of all materials, equipment and components as specified
             or having an impact upon the design or performance of the mechanical services
             installation.

             The Contractor is to be responsible for identifying at an early stage; the delivery period
             associated with all equipment and is to satisfy himself that these can be procured
             within the constraints of the construction programme, without adverse effect on the
             project.

             Should the Contractor identify any potential problems these are to be reported as soon
             as is practicably possible.

             Where information on the services in any area is not provided, it is the responsibility of
             the Contractor to select equipment, materials and components, suitable for the
             application and thereafter design and install an adequate layout, with due
             consideration of the usage of the space.

             Any omission from the tender in this regard, are to be clearly and unequivocally stated
             and highlighted within the tender submission.

             The Contractor is to produce detailed working installation drawings, fully co-ordinated
             in every respect in terms of distribution routes and equipment locations, with the
             installation components etc., of all other services and building disciplines.

             It is to be the responsibility of the Contractor to satisfy himself that all mechanical plant
             and equipment sizes provided to him in the tender documentation are of adequate size
             for the installations for which they serve. This is to include, but not limited Pipework,
             Pumps, Heaters etc.

             It is to be the responsibility of the Contractor to satisfy himself that all plantrooms and
             ducts/cupboards etc. shown for the routing/positioning of mechanical services and

McDonalds Restaurants Ltd                         1 / 19
   19   20   21   22   23   24   25   26   27   28   29