Drainage & Piped Services Standard Specification
Version 2014-1

1.2.32 Contractors Test Certificates

             The Contractor is to in accordance with the testing and commissioning section of the
             ER's forward to the Project Manager certified copies of results obtained from testing
             and commissioning.

             The Contract works, or sections thereof, should be first tested, commissioned and
             proved by the Contractor prior to offering to the Project Manager for witness testing. A
             minimum one days' notice should be provided to the Project Manager of all testing and
             commissioning requiring witness testing. Testing and commissioning results should be
             forwarded to the Project Manager for his information and use prior to site witness
             testing.

             Should the Contract Works, or sections thereof, fail the witness test or not be available
             for witness testing at the appointed time resulting in an abortive visit by the Project
             Manager, the Contractor may become liable to a charge for the Project Manager to re-
             attend the re-testing or re commissioning.

1.2.33 Timely Submission Of Record Documents

             The Project Manager shall recommend to the PM that a minimum sum to be
             determined by the PM is withheld from the Contractors final account pending
             submission of approved record documentation as defined elsewhere in this document.

             Should the Contractor fail to provide the record documents within the time specified
             under written notice, the Project Manager is to instruct the works to be executed by
             other competent bodies and the actual costs of this instruction shall be deducted from
             the contract sum.

1.2.34 Drawn and Other Information

             The Project Manager shall require 10 working days from receipt of drawings to
             examine/comment and, if necessary, a further 5 working days from receipt to re-
             examine, where the initial issue is not acceptable. These time periods are to be
             included within the Contractors programme to ensure timely issue of information.

                1. Provide calculations where applicable.
                2. .Provide final sets of Operation and Maintenance manuals in accordance with the

                     main contract requirements (but shall be a minimum of 2 hard copies) inclusive
                     of drawings and CD-ROM of manual and drawings (AUTOCAD dwgs and PDFs).

1.2.35 Timely Completion of Outstanding Works

             The Contractor shall be provided by the Project Manager upon Practical completion
             with a list of incomplete and unacceptable works. The Contractor shall remedy the
             incomplete or unacceptable works within a maximum of one week unless stated
             elsewhere.

             The Contractor is to produce a written schedule of those items, on the Project
             Managers list of incomplete and unacceptable works that he is unable to remedy within
             the written period of notice.

             The incomplete and unacceptable works shall be valued by the Project Manager with a
             sum of money withheld from the Contractors final account pending remedy of the
             incomplete and unacceptable works.