Page 78 - STS Pre-Site Induction 09.04.21
P. 78

ARC FLASH HAZARD









          SPECIALIST TECHNICAL SERVICES




                                                                         ● Ensure that exposed live conductors are



                                                                               protected where possible.





                                                                      ● Understand the electrical system you are working




                                                                              on & its Cal rating.



                                                                      ● Provide on site local training and job briefings.




                                                                      ● Plan the task carefully – RAMS and detailed S.P.A.



                                                                      ● Never wear any conductive materials like jewelry.




                                                                      ● Use suitably rated arc flash PPE & tools while



                                                                              working with energised equipment.




                                                                      ● Take the time to plan properly and prepare the



                                                                             panel to maximize protection levels.




                                                                      ● Have an emergency plan in place.
































                                                                                                 SAFETY WITHOUT COMPROMISE















                                                                                 ENGLISH                      FRENCH                      POLISH                  GERMAN                       ITALIAN                  ROMANIAN                        INDIAN
   73   74   75   76   77   78   79   80   81   82   83