                     o Plan-to-Program Comparison.                     ■ Based upon the  approved Schematic  Design
                     o Design narrative  describing  preliminary       Documents,    prepare   Design   Development
                     selections of major building systems and          Documents for all required disciplines.
                     construction materials.                           ■ Record and distribute minutes from consultant
                     o Submit  and  complete  all  correspondence  and   coordination meetings and design meetings with
                     documentation required for submission to New      the Owner.
                     Jersey Department of Health.                      ■ The Bernardon Team will coordinate with the
                     o Updated design schedule.                        Construction Manager who will update the estimate
                                                                       of the Cost of the Work, and we will participate
               Design Development                                      in an estimate review session with the Owner,
               During this phase, the building design and systems are   Project Manager, and Construction Manager.  We
               developed in greater depth and will contain such detail   will also participate in any value analysis sessions
               as is typically required for design development under   structured to improve the design or reduce the
               the standard AIA contract and shall be consistent       overall construction cost.
               with AIA Best Practices. Mechanical and electrical      ■ Revise the Design Development Documents to
               systems, architectural materials, and finishes will be   comply with the target construction budget if the
               more clearly defined in drawings and specifications.     construction cost estimate  exceeds  the approved
               Special systems for security, environmental control,    budget and as directed to do so by the Project
               data and communication, lighting, acoustics, life       Manager.
               safety, and graphics will be investigated and reviewed     ■ Deliverables:  During this phase, the Bernardon
               with  AtlantiCare.  The  Bernardon  Team  will  also    Team  will  prepare  and  submit  the  following
               coordinate furnishing locations and equipment with      deliverables to AtlantiCare.  All such deliverables
               preliminary lighting and power layouts.  During this    will be subject to review and approval by
               phase, we will complete the following tasks:            AtlantiCare.  It is understood that revisions
                                                                       may be required to these documents to address

                  ■ Advise the Owner and Project Manager in writing    concerns raised  by AtlantiCare and/or other
                  if at any time it appears that the Project Schedule   Project stakeholders. Work product delivered will
                  or Construction Budget may be exceeded and make      be owned by AtlantiCare.
                  recommendations for corrective action.                  o Preparation of documents, ready to be released
                  ■ Meet with the Owner and Project Manager at            for updated pricing including plans, sections,
                  intervals acceptable to the Owner and Project           elevations, typical construction details, and
                  Manager to review drawings and other documents          equipment layouts that illustrate and describe
                  which represent the current status of the Design        the fine-tuning of the Project’s design and the
                  Development of the Project.                             size and character of the Project in terms of
                  ■ Prepare a detailed code analysis for review with      architectural, structural, mechanical, plumbing,
                  the  appropriate  agencies  before proceeding to        and  electrical  systems,  materials,  and  other
                  the Construction Documents phase. Meet with             elements as may be appropriate.
                  AHJ over the project (local, county and state           o Specifications sufficient to identify the quality
                  municipalities) to review plans and code related        and  other  characteristics  of  the  proposed
                  issues.                                                 or selected materials, equipment, finishes,
                                                                          fixtures, and systems.

               BERNARDON | Response to Request for Proposal Architectural and Engineering  Services
               AtlantiCare Health Services | Manahawkin Ambulatory Surgery Center | June 7, 2021      Page 22
   22   23   24   25   26   27   28   29   30   31   32