Page 10 - Bernardon Proposal-Progressive New Homes
P. 10

www.bernardon.com













                   ■ Provide two (2) or three (3) design vision        ■ Attend two (2) in-person meetings and
                   boards to show the suggested design direction       participate in teleconferences as necessary to
                   through color, materials, and conceptual            review the amenity space, selected finishes,
                   images;                                             furniture, and artwork selections.
                   ■ We will attend two (2) meetings to review of
                   initial design concepts and modify the designs   Units
                   as directed to obtain your approval of the          ■ Presentation of selections for unit finishes.
                   building’s interior design;
                   ■ Select physical finish materials envisioned for   We will include artwork and decorative accessories
                   the space for review; and                        budget based on approved furniture plans as part
                   ■ Prepare conceptual furniture and finish plans   of FF&E services.  This approved budget will be
                   showing suggested changes in materials.          used by the Interior Design team as well as the
                                                                    Bernardon Procures team during the FF&E phase
               Once we have received approval from you for our      as further described below.
               Interior Design Schematic Design phase, we will
               proceed onto Phase II – Design Development.          Once we have received approval from you for our
                                                                    Interior Design Design Development phase, we will
                                                                    proceed onto Phase III – Construction Documents.
               Phase II –  Design Development
               The  selections made  during  the  Schematic
               Design process shall form the base information       Phase III – Construction Documents
               to proceed with a more refined set of Design         Based on approvals made during Design
               Development documents.  Your ongoing design          Development, Bernardon will move forward
               review comments will be incorporated into            with interior documentation for bidding and
               the design as this phase proceeds.  We will be       construction.  The following tasks and deliverables
               present for all applicable coordination calls and    will be provided during this phase:
               meetings. The following tasks and deliverables
               will be provided during this phase:                  Clubhouse
                                                                       ■ Interior finish plans;
               Clubhouse                                               ■ Interior furniture plans;
                   ■ Provide a 3D SketchUp model of design-            ■ Lighting/reflected ceiling plans and details;
                   focused areas based on approved floor plans         ■ Lighting fixture schedule;
                   that show the initial interior design direction     ■ Plumbing fixture schedule;
                   and volume of the interior space;                   ■ Interior details;
                   ■ Lighting/reflected ceiling plans;                 ■ Millwork plans, elevations, and details; and
                   ■ Finish plans;                                     ■ Technical specifications (book format).
                   ■ Material schedules;
                   ■ Millwork plans and elevations;                 Units
                   ■ Furniture plans;                                  ■ Unit finish plans; and
                   ■ Furniture, fixtures, and equipment (FF&E)         ■ Unit finish schedule.
                   estimate and schedule; and




               BERNARDON | Response to Request for Proposal
               Progressive New Homes | Kennedy Kenrick Residential Development | August 12, 2022          Page 6
   5   6   7   8   9   10   11   12   13   14   15