Page 8 - Bernardon Proposal-Progressive New Homes
P. 8

www.bernardon.com













               We will document the project as a 3D Revit              ■ Drawings:
               model that will be used for the life of the project        o  Overall floor and ceiling plans;
               for Construction Documents and coordination                o  Overall roof plan;
               with our consultants.  The following tasks and             o  Exterior elevations;
               deliverables will be provided during this phase:           o Building sections;
                                                                          o Typical wall sections;
                   ■ Four (4) Meetings:                                   o Enlarged unit plans;
                      o Project kick-off meeting;                         o Door and window schedules;
                      o Progress design review meeting;                   o Structural engineering plans and
                      o One (1) meeting with local jurisdiction; and      details; and
                      o Schematic Design review meeting.                  o MEPFP plans, riser diagrams, and details.
                                                                       ■ Technical specifications (Book Format).
                   ■ Drawings:
                      o General information with code summary;      Four (4) Design Review and Coordination meetings
                      o Overall floor plans with unit layouts;      have been included in this phase.
                      o Colored building elevations;
                      o Overall building section;
                      o Structural basis of design narrative; and   Phase III –  Construction Documents (10 weeks)
                      o MEPFP basis of design narrative.            With your approval of the Design Development
                                                                    set of documents, we will prepare documents
               Phase II – Design Development (8 weeks)              suitable for final bidding, permitting, and
               The approved solutions created during the            construction as follows:
               Schematic Design process shall form the base
               information to proceed with Design Development          ■ Drawings:
               documents.  Minor ongoing design review                    o Architectural floor plans for each floor
               comments will be incorporated into the design as           and roof;
               this phase proceeds.  Prior to our meetings, we will       o Enlarged plans and details of each unit;
               assess the ramifications of the proposed changes           o Building elevations;
               or improvements as they relate to structural, code,        o Wall sections;
               systems, and cost implications.  We will prepare           o Exterior and interior details;
               documents for preliminary pricing and distribute           o Schedule for doors, hardware, and
               them to you for review and critique.  The goal will        plumbing fixtures;
               be to finalize the architectural relationships and         o Stair sections and details;
               determine structural implications.  We will provide        o Elevator plans and sections;
               the following Design Development documents at              o Structural plans and details; and
               the conclusion of this phase:                              o MEPFP plans and details.
                                                                       ■ Technical specifications (Book Format).

                                                                    Four (4) Design Review and Coordination meetings
                                                                    have been included in this phase.