Upon presenting the water usage reduction potential of  Implementing Eco-Solution 1 resulted in a notable
            Eco-Solution 1 to the Starlight management team, their  reduction in monthly water consumption for the workshop
            willingness to implement the eco-solution was evident,  by approximately 50%, equating to approximately 28m³/
            driven by the perceived business benefits and anticipated  month (Table 4). This reduction in water usage translated to
            cost  savings  in  operational  expenses.  Encouraged  by  the  an annual carbon emissions reduction of 480.48kg CO2/m³
            supportive feedback from management, the ESI team was  (see Table 3). This reduction in water usage translated to a
            motivated to proceed with designing and implementing the  reduction in annual carbon emissions of 480.48kg C02/m³
            solution.                                            (see Table 5).

            The ESI team conducted multiple company visits to      Table 4: Comparison of water usage before and after
            determine the optimal project location, placement, layout,   implementation.
            and dimensions. Subsequently, the team dedicated two
            weeks to design the product. Figure 11 and 12 illustrate the
            design drawings developed by the students.


                                                                   Table 5: Annual water saving and annual carbon
                                                                   emission reduction.

                                                                   Resource   Monthly     Annual CO2    Conversion
                                                                               Saving      Emissions     Factor
                                                                                          Reduction

                                                                    Water (m³)   28     480.48 kg CO2/m³  1.43 kg CO2/m³


                                                                 According to PUB water pricing (7), water prices for industry
                                                                 are $2.13/ m3, and annual cost savings therefore = 336 m³ x
                          Figure 11: Tank Dimension.             $2.13 = $715.68.

                                                                Eco-solution 1 was fabricated based on the ESI  Team's
                                                                design sketches, as shown in Figure 13. Before installation,
                                                                the ESI team recorded the water usage readings to
                                                                establish a baseline. On 15 Feb 2023, the product was
                                                                successfully installed and operated, as shown in Figures 14
                                                                and 15. During the installation, the ESI team encountered
                                                                challenges in joining and fitting the piping layout from the
                                                                central hose. However, with assistance from the fabrication
                                                                vendor, they overcame these obstacles and installed the
                                                                product according to the planned design. Subsequently,
                                                                the team conducted monthly visits to monitor water usage
                                                                and documented their findings over two months.
                     Figure 12: Tank Dimension Drawing.