Ref  : CM-DFH4-2014-1
                                                    BEAZLEY                   Issue : 1

                                               DFH 4 Series Spacecraft        Date : 28 Sept 2014
                                                                                                Page 16 of 38



                  Loasat-1               Observation                    Comment /Assessment          Cri

                                                                    brokers, to get their feedback.,
                               A dedicated monitoring and inspection team
                                was established since the very beginning of the
                                program. The team has the manufacture
                                monitoring experience in former DFH-4
                                program. Several managers and technical   Are these teams independent or under the
                Manufacturing   experts from DFH-4 program are involved in  control of the program?
                  Monitoring    related activities. Some of them will be   The operation of these teams, their reporting
                                resident in the field office of CAST since  line, their delegation of authority should be
                    teams       system AIT. The team attended system,
                                subsystem and critical unit monitoring and  detailed in an overall management plan
                                inspection.
                               Page 142.Extensive test monitoring by the
                                resident monitor team from Laos and China
                                consultants.
                               A dedicated monitoring and inspection team
                                was established since the very beginning of the
                                program. The team has the manufacture
                                monitoring experience in former DFH-4
                                program. Several managers and technical
                Manufacturing   experts from DFH-4 program are involved in
                  Monitoring    related activities. Some of them will be   Are these teams independent or under the
                                resident in the field office of CAST since  control of the program?
                    teams       system AIT. The team attended system,
                                subsystem and critical unit monitoring and
                                inspection.
                               Page 142.Extensive test monitoring by the
                                resident monitor team from Laos and China
                                consultants.
                               Page 137.Environmental tests done before   Why  not,  but  this  is  not  a  program  schedule
                                                                    oriented.
                  System test   TVAC, it means several mounting of   A program development plan  for each satellite
                                appendices (Solar Array, antennas).
                   phases                                           (or at least a combined development plan should
                                                                    be provided
                  Sequential
                 Launch flow   Page 148.  It appears that there is an Antenna   Why not, but there is no health check done after.
                  spacecraft      and Solar Array deployment done on the
                                       launch pad, before fuelling.
                  operations
                               A dedicated monitoring and inspection team
                                was established since the very beginning of the
                                program. The team has the manufacture
                                monitoring experience in former DFH-4
                                program. Several managers and technical
                Manufacturing   experts from DFH-4 program are involved in
                  Monitoring    related activities. Some of them will be   Are these teams independent or under the
                                resident in the field office of CAST since  control of the program? See above
                    teams       system AIT. The team attended system,
                                subsystem and critical unit monitoring and
                                inspection.
                               Page 142.Extensive test monitoring by the
                                resident monitor team from Laos and China
                                consultants.
                               Page 137.Environmental tests done before   Why  not,  but  this  is  not  a  program  schedule
                  System test   TVAC, it means several mounting of  oriented.
                   phases       appendices (Solar Array, antennas).   It is recommended that the first satellite of that
                                                                    series is submitted to PFM test
                                                                  Why not, but there is no health check done after.
                  Sequential   Page 148.  It appears that there is an Antenna   It is a risk to perform these operations on in the
                 Launch flow      and Solar Array deployment done on the  launcher facilities and to ensure that at the end
                  spacecraft           launch pad, before fuelling.  these equipments have been properly stowed


             This document is proprietary of BEAZLEY© and must be treated on a confidential basis. It may be used solely by BEAZLEY, use or reproduction, of the document and the
                                  Contained therein, for any other purposes without BEAZLEY written consent is prohibited.
   13   14   15   16   17   18   19   20   21   22   23