                                                    BEAZLEY                   Issue : 1

                                               DFH 4 Series Spacecraft        Date : 28 Sept 2014
                                                                                                Page 27 of 38



                                                                   qualification and flight experience.
                                                                 Is  there  any  analysis  of  the  side  effect  (Solar
                                                                   array  degradation,  erosion,  charging,  plume
                                                                   effect. disturbance of  the  RF, radiation.,
                                                                   compatibility with the chemical thrusters...)
                                                                 It seems that they are making use of a thrusters
                                                                   with grid/mesh. This technology was subject to
                                                                   life degradation in the past (Boeing experience)
                                                                   . How they have solved this issue which is very
                                                                   critical with respect of the 15 years life?
                                                                 Nothing is said on the Xe pressure regulator (is
                                                                   it a mechanical one or an electronic one) Here
                                                                   again what is its life qualification?

                 Deployment   Solar array deployment and strategy for  The  complex  antenna  deployment  is  not
                                deployment not addressed.
                 Mechanisms   Antenna deployment system not addressed.  described  and  will  be  very difficult to  be  tested
                                                                   on  ground.  Deploying this  complex  antenna
                                                                   (making use of certainly complex 0g device) on
                                                                   the launch pad is a major risk


                 CHINASAT 16             Observation                    Comment /Assessment          Cri

                                                                  All  the  dates provided  in  this  schedule  are
                                                                   erroneous  or  not  realistic.  Several  events  have
                                                                   the status accomplished but they are scheduled
                                                                   for 2015!!
                                                                  We believe that it is a “copy paste” error.
                                                                  Schedule not credible. See below.




                                                                 2013.04.27 The contract was formally signed
                                                                 2013.06.30 Kick-off meeting finished
                                                                 2014.09.20 S/C PDR Accomplished
                                                                 2015.06.30 S/C CDR Accomplished
                                 Since there is no detailed schedule, the page
                   Project        161 is considered as the master schedule.  2015.07.30 SM/PM/CM disassembly
                  Schedule       With a Kick Off June 2013 and delivery in  2015.09.30 Satellite Performance Test (SPT) started
                                          orbit May 2017.        2015.12.30 SPT1-A1/A phase Accomplished
                                                                 2016.01.30 Platform & CM Mating Accomplished
                                                                 2016.03.30 SPT1-B
                                                                 2016.04.30 SPT1-C1
                                                                 2016.06.10 SPT2 ( S/C Vibration & Acoustic Test )
                                                                 2016.09.30 SPT3 ( S/C Thermal Vacuum )
                                                                 2016.11.30 S/C CATR
                                                                 2016.12.20 SPT4
                                                                 2016.12.30 Pre Shipment Review
                                                                 2017.02.25 Launch
                                                                 2017.05.25 Delivery in Orbit














             This document is proprietary of BEAZLEY© and must be treated on a confidential basis. It may be used solely by BEAZLEY, use or reproduction, of the document and the