Page 25 - test
P. 25

Ref  : CM-DFH4-2014-1
                                                    BEAZLEY                   Issue : 1

                                               DFH 4 Series Spacecraft        Date : 28 Sept 2014
                                                                                                Page 23 of 38






            8. CHINASAT 16 DFH S-4S SPACECRAFT TECHNICAL ASSESSMENT SOME COMMENTS GIVEN
            ABOVE ARE ALSO APPLICABLE HERE

               CHINASAT 16              Observation                     Comment /Assessment           Cri

                             The customer is China Satellite    Explain the meaning of former SINOSAT 4.
                               Communication (China Satcom). The
                               spacecraft is a DFH 4 S, Former SINOSAT 4.
                               type with a Ka payload. And a piggyback item
                               , with 24 active units Launch date 2017, OML
                               15 years. Bus 100 Volts, Li Ion batteries. Ion
                               thrusters.
                             The  spacecraft  is  a  typical  medium size  type,   Classical.         .
                               with  Li  Ion  batteries,  the  payload  is  quite
                               complex.  Mass:  4600  kg,  dry  mass  2066  kg
                 Overview      Power: 8900 W
                             Module arrangement (service module and   Classical, central cylinder, U shape with N South
                               payload)                           and earth panel and antenna feed on the top floor.
                             Most of the hardware is under the   Just a comment
                               responsibility of CAST, some items are
                               subcontracted.
                             Half of the hardware needs to be qualified..   The qualification of this hardware should /could
                               With some really new items like Li Ion  reserve some surprises.
                               batteries. Ion thrusters, new units packaging
                               (several units reassembled in a single unit ...)
                             Page 3. Provide the responsibility of each   Mister Zhou the program manager is also the Chief
                   Team        Chief, Manager, and Directors. Who is  designer on Chinasat 9 A;
                Organization   reporting whom? Who sign the specifications?   Need of a project Management plan giving the inter
                                                                  relation between all the project
                             Rockwell Collins RW, RWE, MW, MWE   Most  of  the  subcontractors  are  located  in  Europe,
                             Galileo IRES                        how  is  the  visibility  with  these  subcontractors  and
                             Chelton isolator, loads             how they manage the export control requirements?
                             NTS, SSPA, LNA & power supplier units.   The  strategy  to  flow  down  requirements  and
                  Major        Receiver & Down converters         monitors the subcontractors is not defined.
               Subcontractors   TESAT RF switches               Who is the supplier of 490 N thrusters and what the
                             TED, LCTWTA , TWT                   flight experience are.
                                                                 Who  is  in  charge  of  OMUXes,  mechanism
                                                                  (deployment,  steerable  antenna  etc..)  thermal
                                                                  (design and hardware).
                               Forward link 26 channels (bandwidth 6608
                                Mhz) powered by two 2x 12 for 10  radiative
                                LVTWTA (100 W) and 8 for 6 receivers and
                                           master LO.            The  payload  and  antennas  are  quite  complex  and
                                                                  new.
                             Return link 26 channels (bandwidth 6608 Mhz)   Statement: Down  converter  can  be  modified  by
                               powered by 8 for 6  conductive  LWTA (50 W)  removing LNA from the receiver, thus qualification
                                 and 38  LNA.and 8 for 6 Down converters.  of Ku band receiver can cover the verification of Ku
                 KaBand       Antenna they claim that the various items have  band down converter. No need for qualification unit
                 payload       been qualified on several programs, this is only  manufactured for Ku band down converter. This is
                               a statement, a breakdown of the qualification
                               of each item will be usefull. The ADPME  at  the  limit  of  unit  qualification. For  a  standard
                               (commanding need to be qualified for Chinasat  customer a qual model will be needed. Obviously all
                               16.                                the equipment should undergo a PFM test  cycle
                                                                 Units qualified on other programs Ka-sat, Yasat and
                               .What are the margin taken for the antenna?  Hylas is one thing, but it should be proven that the
                                What is the pointing considered? What is the  environment  on  other  spacecrafts  encompass  the
                                 pointing accuracy during station keeping.  DFH 4S requirements.
                                                                 Stating that going from Ku band to Ka band is just a


             This document is proprietary of BEAZLEY© and must be treated on a confidential basis. It may be used solely by BEAZLEY, use or reproduction, of the document and the
                                  Contained therein, for any other purposes without BEAZLEY written consent is prohibited.
   20   21   22   23   24   25   26   27   28   29   30