II.  Drawings – for package components
                                 a.  Each component drawing along with referenced specifications and drawings must be
                                     submitted with each First Article.
                                 b.  Each dimension and note must be ballooned (numbered)

                          III.  Dimensional Results – for package components
                                 a.  A one piece dimensional layout is required for each mold, cavity, die and production line
                                     that produces a package component.
                                 b.  Dimensional results must be provided for all dimensions, notes and other specifications
                                     on the component drawing.
                                 c.  The dimensional layout must correspond to the ballooned drawing.

                          IV.  Process Capability Studies
                                 a.  Process Capability Studies should be completed for all special characteristic dimensions
                                     as determined by Sun
                                 b.  All special characteristics must have Cpk => 1.33 or Ppk =>1.67, Cr < 0.75 and ∆Z< 0.5

                          V.  Samples
                                 a.  For package materials, suppliers may be required to submit component parts for each
                                     cavity with each First Article Submission.
                                 b.  Chemicals samples shall be representative of the production run.
                                 c.  Each sample product must have a tag indicating it is a First Article sample. The tag
                                     should include part number, revision level, date components were produced, supplier
                                     name, and cavity number.

               Suppliers may be able to submit one First Article submission for a family of components. Sun will notify the
               supplier when this type of submission is necessary.

               No First Articles should be submitted to Sun if any dimensions or test results do not meet specification or
               component drawing requirements. Supplier shall make every attempt to implement corrective action for any
               out of spec condition.  Suppliers shall contact Sun R&D Technical Group and/or Sun Package Development Group
               if they are unable to meet specification requirements. Sun will then inform suppliers on required course of
               action.


        12 • •• • TEMPORARY DEVIATION REQUEST



               If a supplier manufactures product that does not conform to Sun specifications and lead-time does not allow
               permanent corrective action due to Sun production requirements a temporary deviation request must be
               submitted to Sun Quality and/or Sun R&D  and approved prior to shipping non-conforming material.


               Sun approval will be based on how deviations might impact the performance, form, fit and function of the
               materials/components.

               Deviation requests must include details of the non-conformance and the amount of materials/components
               affected.  Sun OOS Temporary Deviation Request form may be used.

               If the deviation is not approved, the supplier may not release the product. Unapproved product will be rejected.

        CORPSQA-002 Rev. 5   Date: 11/19/2014
                                                                                                          8
                                                          Supplier Quality Systems and Expectations Manual