Page 37 - GuardII+ Series 4208 Platform PD User Manual
P. 37
Installation
5. Installation
This manual only describes installation of the PD card itself; for details on the installation
of the GuardII+ Series 4208 Platform assembly or PD sensors, refer to the appropriate User
Manual for that component.
This installation procedure assumes that no other monitoring technologies are installed in
the GuardII+ monitor. Note that if there is another monitoring technology, this will not affect
the installation of the PD card, however care must be taken to make sure the card and cabling
for the other technology are not disturbed.
NOTE:
GuardII+ installation must be performed by qualified personnel according
to all applicable local regulations and standards.
Use the monitor only as specified by the operating instructions or the safety
protection of the monitor may be impaired.
NOTE:
The information provided represents a typical installation for a GuardII+
PD card. Some installations may require custom work not described here;
if assistance is needed contact Iris Power LP Technical Support. For
installation of specific monitoring technologies refer to the User Manual for
that technology.
5.1. Overview
The installation shall be performed according to this manual and applicable local codes
and standards.
For valid monitor operation, the GuardII+ should only be connected to Iris Power LP PD
sensors or Iris Power LP approved equivalents.
WARNING:
Before working with the GuardII+ monitor, disconnect the power. This
can be done at the plant breaker or the power switch inside the monitor.
A circuit breaker must be near the equipment and it shall be marked as the
disconnecting device for the equipment. The maximum rating of the circuit
breaker is 15 AMP. If the monitor needs to be removed from the enclosure,
use the plant breaker to disconnect the power.
IMPORTANT:
The main power source for the GuardII+ should NOT be a line on which
severe voltage dips or voltage drop-outs may occur. These may cause
problems for the monitor.
NOTE:
Remove the electronics from the enclosure before drilling conduit holes.
Refer to the GuardII+ Series 4208 Platform User Manual for details.
29
www.irispower.com