Page 53 - 14th @ Irving Basis of Design (internal)
P. 53

8.9.4  COMPONENTS
        MTER Cabinets Each cabinet located within the MTER will be of the following specification:
            •   42u high

            •   24 in (600 mm) wide x 42 in (1080 mm) deep
            •   Front and rear 19” (483 mm) mounting rails
            •   Vertical cable management on both sides at the front of the cabinet for patch lead management
            •   Lockable wire mesh front and rear split doors

            •   Removable side panels for each cabinet bay
            •   Vertical power distribution strip mounted at the rear of the cabinet
            •   3 in (75 mm) tray fitted both sides to allow for cable management
            •   All cabinets are to be bayed together in the MTER
            •   All cabinets will be bonded to the telecommunications grounding earth bar
        TR Racks Each rack located within the TR rooms will be of the following specification:

            •   7’ high, 19 in (483 mm) mountable with standard EIA hole spacing
            •   42U minimum usable spaces
            •   Racks shall be bolted to the slab at front and rear flanges and tied to overhead ladder rack
            •   All racks are to be bayed together in the TRs

            •   Vertical cable management shall be dual sided for patch lead management at the front and horizontal cable distribution
               management to the patch panels at the rear
            •   Vertical power distribution strip a minimum of 5 ft (1.5 m) mounted to stand off brackets at the rear of the racks
            •   All racks will be bonded to the telecommunications grounding earth bar



        8.10 GENERAL REQUIREMENTS FOR ALL IT SPACES




        8.10.1 ARCHITECTURAL REQUIREMENTS

            •   Each IT room shall be located directly off a service corridor or hallway to provide access to maintenance and operational
               personnel.
            •   Floor finish shall be type VCT.
            •   Minimum structural strength of the floor slab shall be 100lbs/sf.

            •   A ceiling is not required or desired, any exposed areas within the room that contains spray on type fireproofing shall be
               sealed to prevent flacking and mitigate airborne dust.
            •   Walls shall be stud framed and gypsum board with a minimum 2-hour rating and painted a light color. The wall shall
               require ¾” fire rated plywood in the locations indicated on the T drawings. Plywood shall be painted with 2 coats of white,
               fire retardant paint, with plywood manufacturers stamp masked off on each sheet so that the AHJ may witness it is fire
               retardant.

            •   The entry door shall be 36” x 84” and open outward when possible.
            •   The space must not be located adjacent to or below sources of water or water draining equipment or EMI/EMF generator
               equipment.



        14th @ IRVING                                                                                             WSP
        Project No.  B1809809.000
        RAL COMPANIES & AFFILIATES                                                                             Page 53