Reservoir 75mm W.O. & S.V. 5 No. 3m S.S. 6 No. 3m S.S. Metres 7000
T.W.L. 210 1 No. 22½°
6000
75mm W.O. & S.V 1 No. 3m S. & S. 5000 16.9.93 31.1.94
A.V.
450mm Rising main A.V. A.V. 300 S.V 4000 23.9.93 31.1.94
A.V. 450–300 Taper 300–450 Taper 3000 31.12.93
2000 16.9.93
75mm W.O. 75mm S.V. 2 No. 3m S. & S. 1000 2.9.93 Pipeline progress chart
A.V. 1 No. 45° 30.11.93 15.12.93 14.1.94
Pumping station
0 Pipes delivered Laid Tested Reinstated
200m 100m Height A.O.D. Fig. 14.5.