Reservoir
                                   T.W.L. 210
                                        A.V.
                                  450mm Rising main
                                           A.V. A.V. A.V.  75mm W.O. & S.V.  450–300 Taper 5 No. 3m S.S. 75mm W.O. & S.V  300 S.V  1 No. 22½° 1 No. 3m S. & S. 300–450 Taper 6 No. 3m S.S.  Metres  7000  6000  5000  4000  3000  16.9.93  23.9.93  31.1.94 31.1.94 31.12.93


                                                                      2000   16.9.93



                                                       75mm W.O.  75mm S.V.  2 No. 3m S. & S.  1000  2.9.93  Pipeline progress chart
                                           A.V.              1 No. 45°         30.11.93  15.12.93  14.1.94




                                               Pumping  station


                                                                      0      Pipes delivered  Laid  Tested  Reinstated
                                       200m          100m  Height A.O.D.                Fig. 14.5.
   187   188   189   190   191   192   193   194   195   196   197