Page 79 - B8773-AEW-XX-XX-PP-A-0001_[P1]_Contractors Manual
P. 79

4.4.7 Validator Safe                                 4.4.8 Door Bell

The “Validator” safe is standard - necessary         a) Supply and install a push button operated
power and telecoms wiring must be installed in       door bell to the back door. The unit shall be
all new stores.                                      transformer fed from the main supply and
                                                     provide a continuous ringing tone clearly
•	 The site electrician should run one CAT 5E        audible in both the Manager’s office and main
    cable from the Validator safe, to the position   shop area.
    of the Modem/ADSL socket under the front
    counter - to be finished at both ends with an    b) Supply and install a push button operated
    RJ45 socket.                                     door bell to the shopfront door for customer
                                                     assistance purposes.
•	 It is then up to the safe company to provide
    the necessary patch cables and plug it in

•	 The sockets for this should be labeled “SAFE”
    at both ends.

•	 The electrician should also provide a single
    13a unswitched fused spur with cable outlet
    and a double 13a unswitched socket at the
    safe position (These sockets should be on
    one dedicated clean (red socket) circuit).

•	 The data/power sockets need to be either
    offset slightly to one side, or above the safe,
    so that staff can get to them.

Safe dimensions:
1110mm(H)x540mm(W)x520mm(D) inc. hinges.
In addition a small printer will sit on top.

4.4.7 - 4.4.8  Validator Safe and Door Bell          3 February 2016
   74   75   76   77   78   79   80   81   82   83   84