Page 86 - B8773-AEW-XX-XX-PP-A-0001_[P4]_Contractors Manual
P. 86

4.6 Ventilation and Air Conditioning
                            D R A F T




       From  the  beginning  of  2013,  the  standard        •  HVCA – RUAG70 Guide to Good Practice for
       ceiling colour in Customer area and Bake and              Refrigeration
       Serve has changed from standard white to RAL          •  The Building Regulations
       7037 ( grey) for both new stores and re-fits. All     •  Gas Safety (Installation and Use) Regulations
       ceiling  grilles  and  air  con  ceiling  face  plates    1998
       will therefore need spraying to match – White
       or other colours will not be acceptable in these      All plant, ducts, pipes  cables  etc. shall  be
       area’s (BOH is not affected and will remain in        adequately  protected  against  accidental
       white.)                                               damage,  corrosion  and  external  environment
                                                             and shall be capable of safe decontamination
                                                             and  removal  in  the  future  without  disturbing
                                                             other  services. Pipes and ducts shall  be
                                                             adequately sized, kept as short as practicable,
       4.6.1 Overview                                        leak-proof with a minimum number of joints and
       The  project  includes  all  of  the  mechanical      have provision for routine maintenance.
       services works associated with the fitting out of
       an existing shell unit to create a fully operational   All  facilities  shall  be  designed  to  prevent  the
       pizza delivery operation. Domino’s operation          ingress or egress of rodents, vermin and insects.
       produces  very  little  grease  and  the  extract
       system is predominantly removing heat and gas         The HVAC contractor shall supply the client with
       combustion fumes.                                     system  design  drawings,  prior  to  manufacture
                                                             and  installation.  The  HVAC  contractor  will
       All  work  shall be  carried  out  in  accordance     also supply a  comprehensive operation  and
       with  the  latest  relevant  British (  or  Irish  where   maintenance manual on completion of the
       appropriate)                                          works.
       and European Standards, Statutory Regulation
       and  Byelaws  together  with  the  following          For  projects  in  England  and  Wales,  the  HVAC
       publications                                          contractor shall also demonstrate compliance
       •  CIBSE Codes and Guides to Current Practice         with Building Regulations Approved Documents
       •  Water Authority By Laws                            L2A & L2B. This will include:
       •  HVCA – DW143 Practical Guide to Ductwork           •  Provision  of  details  of  the  efficiency  and
          Leakage Testing                                        controls of heating, cooling and ventilation
       •  HVCA - DW144 Specification for Sheet Metal             systems  in  accordance  with  the  Non-
          Ductwork                                               Domestic Heating, Cooling and Ventilation
       •  HVCA - DW172 Guide to Good Practice for                Compliance Guide (2006).
          Kitchen Ventilation Systems                        •  Provision  of  commissioning  certificates
                                                                 including air leakage tests on the ductwork.







       4.6.1                       Ventilation and Air Conditioning - Overview           3 February 2016