Page 87 - B8773-AEW-XX-XX-PP-A-0001_[P4]_Contractors Manual
P. 87

These  drawings  will  have  formed  part  of  our A F T




          Supply and exhaust ventilation systems shall be
          installed in accordance with the standards and
          regulations  listed  and  the  requirements  of  the
          oven manufacturers.

          All systems shall be low velocity in accordance
          with  DW/144.  Fire/smoke  dampers  shall  be
          installed in all fire compartment walls to Building
          Control requirements. The system shall normally
          terminate  with  a  narrowed  vertical  discharge,
          to  increase  efflux  velocity,  unless  specifically
          required otherwise by the Local Authority.

          The HVAC contractor shall ensure that externally
          the ductwork conforms to the supplied drawings
          in  terms  of  its  route,  height  and  termination.


          Planning  Approval  and  must  not  be  deviated
          from without express permission from the DPG
          Project Manager.  D R




































          4.6.1                      Ventilation and Air Conditioning - Overview            3 February 2016
   82   83   84   85   86   87   88   89   90   91   92