Page 197 - (KU)01-75GAJ-1.5 - Change 1
P. 197

INTRO


   EP'S                                                              (KU)01-75GAJ-1.5                 *     FIGURES


                              1.2.5 SP GENERATED CNI-MS OPERATIONAL                                   A
                                              ADVISORY MESSAGES                                              ACAWS

                                                                                                      B
                              ROUTE ALREADY EXISTS                                                          GROUND

                              $ VWRUHG URXWH ZLWK WKH VDPH LGHQWL¿HU DOUHDG\ H[LVWV                   C
                              RUNWAY N/A FOR SID                                                            TAKEOFF

                              $ UXQZD\ LV VHOHFWHG IRU WKH RULJLQ DLUSRUW  WKH ÀLJKW SODQ FRQWDLQV D 6,'    D
                              but it is not applicable to the selected runway.
                              RUNWAY NOT FOUND                                                        E     FIRE/SMK
  NORM                        5XQZD\ LGHQWL¿HU IRU RULJLQ DLUSRUW LV QRW D YDOLG UXQZD\

                              SLOW DOWN                                                               F     PRES/OXY
                                    NOT FOR FLIGHT
                              Preprogrammed slow down point has been reached.
                              SP SW MISCOMPARE
                              The software part numbers for SP1 and SP2 are not the same.            G     ENG/PROP
                              SPn DEFAULT MAG
                              The current magnetic variation table is invalid and VAR the SP is using   H      FUEL
                              the OFP default table.
                              SPn MISSION DB INVALID                                                  I

                              SP 1 or SP 2 mission database is invalid.                                        AAR
                              SPn NDB INVALID                                                         L
  SPEC                        The WWNDB in SPn is corrupted.                                                   ELEC
                              SPn NDB OUT OF DATE                                                    M

                              WWNDB in SPn is not current.                                                     HYD
                              TIMER 1 EXPIRED                                                         N
                              &RXQW GRZQ XS WLPHU KDV ¿QLVKHG
                              TIMER 2 TARGET                                                         O      FLT CTRL
                              Current time has reached crew selected time.
                              TIMER 3 INTERVAL                                                        P       GEAR
                              Selected periodic time interval has elapsed.
                              TRANSFER ABORTED                                                        R     DOR/RMP
  PERF                        An error occurred while transferring data to/from the mission computer
                              and the transfer was aborted.
                              TRANSFER COMPLETE                                                       S     JETTISON

                              A data transfer to/from the mission computer has been successfully
                              completed.                                                              T     LANDING
                              TRANSFER IN PROGRESS
                              A data transfer to/from the mission computer is in progress.            U
                              UNABLE NEXT ALT                                                               DITCHING
                              Altitude constraint for the active waypoint cannot be achieved.         V
                              UNABLE TO EXPAND SAR                                                          BAILOUT
                              CNI is unable to expand SAR pattern as initialized.                    W

  OPER                                                                                        20/10/6/5/4/3/2/1  FAULT LG

                            Use, copying and/or disclosure is   1 -165
                            governed by the statement on the
                            title page of this document.  BACK                                               CHARTS
   192   193   194   195   196   197   198   199   200   201   202