Page 464 - (KU)01-75GAJ-1.5 - Change 1
P. 464

INTRO


   EP'S                  (KU)01-75GAJ-1.5                                                                   FIGURES

                            F     E.  Gear-Up Landing procedure............................Accomplish
                                                                                                             ACAWS
                                       Both the LDG GEAR CNTL-UP ECB (624) and
                                       LDG GEAR CNTL-DOWN ECB (629) will remain
                                       PULLED and the GEAR lever will remain in the                         GROUND
                                       UP position for landing.

                                  (End of Procedure)                                                        TAKEOFF
                         F.  Emergency Retraction procedure...................................Accomplish

                                                                                                            FIRE/SMK
                         G.  Nose Landing Gear Manual Extension procedure...........................
  NORM                   ....................................................................... Accomplish (as required)

                         H.  Gear-Up Landing procedure...........................................Accomplish  PRES/OXY
                                    NOT FOR FLIGHT
                         (End of Procedure)
                                                                                                           ENG/PROP



                         1.16.4 LANDING WITH NOSE GEAR RETRACTED                                               FUEL
                         AND MAIN GEAR DOWN


                         If the nose gear fails to respond to normal and emergency operating                   AAR
                         procedures, an emergency landing may be accomplished, holding the
                         nose of the aircraft up as long as possible. Use the following procedure
  SPEC                   to make a nose gear-up landing:                                                       ELEC

                         A.  Crew and passengers..............................................................Notify
                                                                                                               HYD
                             Give a warning over the PA system and the ICS, and six short rings
                             on the alarm bell.
                                                                                                            FLT CTRL
                         B.  Runway foam....................................................Request, if available

                             An area 3,000 feet long by 30 feet wide should be requested.
                                                                                                              GEAR
                         &   ,5&0 ÀDUHV                                                                           -HWWLVRQ

                                                                                                            DOR/RMP
  PERF                                               WARNING

                                                                                                            JETTISON
                                $OORZ D PLQLPXP RI RQH PLQXWH DIWHU FRPSOHWLRQ RI ÀDUH
                                jettison before initiating fuel dumping operations.
                                                                                                            LANDING
                         D.  Fuel Dumping procedures.........................Accomplish (as required)

                         E.  Aircraft CG.......................................................................As required  DITCHING

                             If cargo can be safely moved, shift to the most aft limit practical
                             considering weight and balance. Refer to Center of Gravity                     BAILOUT
                             Limitations.

  OPER                   F.  Loose equipment....................................................................Secure  FAULT LG

                                                         1 -424            Use, copying and/or disclosure is
                                                                           governed by the statement on the
                                                         BACK              title page of this document.      CHARTS
   459   460   461   462   463   464   465   466   467   468   469