Page 58 - (KU)01-75GAJ-1.5 - Change 1
P. 58
INTRO
EP'S (KU)01-75GAJ-1.5 A FIGURES
1.2.2 CAUTIONS B
ACAWS
Alert/Condition Crew Action
FUS TK XFER PUMP FAIL C GROUND
The pressure switch senses CROSS FEED switches (all)...... CLSD
less than 23 psig, the fuselage CROSS SHIP switch................... Open D
tank transfer switch is in FROM
and there is greater than 400 Transfer FROM switches (all except TAKEOFF
pounds of fuel in the tank. the FUS TANK)............................. OFF E
The pressure switch does not Transfer TO switches................. CLSD
initiate this ACAWS during Pump pressure............................ Verify F FIRE/SMK
NORM transfer or dump operations. If pump pressure is less than 23 psi:
FUS TANK FROM switch............. OFF G PRES/OXY
FUS TK XFER PUMP ECB (751)... PULL
Do not turn the pump on or reset H ENG/PROP
the ECB until proper inspection
and repairs have been performed.
I
Set up another fuel supply as required, or FUEL
transfer using Transfer of Fuselage Tank
Fuel Using Cabin Pressure procedure. L
Total usable fuel................ Recalculate AAR
If the ACAWS clears and pump pressure M
SPEC NOT FOR FLIGHT ELEC
is greater than or equal to 23 psi:
Continue pump operation. N
GBOX 1 (2, 3 or 4) NO OIL PRESS HYD
Displayed during start, if the On the ground: O
gearbox oil pressure is less ENGINE START switch............... STOP
than 15 psi after NP is greater FLT CTRL
than 3 percent for 15 seconds ,Q ÀLJKW P
FIRE handle.................................... Pull
ENGINE START switch............... STOP GEAR
Do not attempt a restart. R
(QJLQH 6KXWGRZQ ,Q ÀLJKW SURFHGXUH
............................................ Accomplish S DOR/RMP
PERF GBOX 1 (2, 3 or 4) OIL PRESS HI
The gearbox oil pressure On the ground: T JETTISON
is above 250 psi and oil ENGINE START switch............... STOP
temperature is greater than or
equal to 60º C for more than 2 ,Q ÀLJKW U
seconds. FIRE handle.................................... Pull LANDING
ENGINE START switch............... STOP V
Do not attempt a restart. DITCHING
(QJLQH 6KXWGRZQ ,Q ÀLJKW SURFHGXUH W
............................................ Accomplish
BAILOUT
X
OPER FAULT LG
-
144 Use, copying and/or disclosure is
governed by the statement on the
BACK title page of this document. CHARTS