Page 95 - (KU)01-75GAJ-1.5 - Change 1
P. 95

INTRO


   EP'S                                                              (KU)01-75GAJ-1.5                 A     FIGURES


                                                  1.2.2 CAUTIONS                                      B
                                                                                                             ACAWS
                                    Alert/Condition                    Crew Action
                              R WING INBD HEAT FAIL                                                   C     GROUND
                              The BA/ECS has detected       Icing conditions........................... Avoid
                              that the right wing inboard ice                                         D
                              protection zone may not be    If failure is due to insuf¿cient bleed air
                              KHDWLQJ VXI¿FLHQWO\ WR UHPRYH   supply:                                       TAKEOFF
                              ice. The ice protection zone   HP...................................... As required  E
                              valve may be failed closed or
                              EOHHG DLU PD\ EH LQVXI¿FLHQW      Advance at least two engines to       F     FIRE/SMK
  NORM                                                          minimum HP shown on the power
                                                                setting schedule in Chapter 12
                                                                (1,300 HP above 20,000 feet,                PRES/OXY
                                    NOT FOR FLIGHT
                                                                incrementally reducing the power     G
                                                                by 100 HP every 5,000 feet until
                                                                reaching 5,000 feet where 750 HP
                                                                should be maintained).                H    ENG/PROP
                                                            Verify the ACAWS clears following the
                                                            next cycle (approximately 6 minutes).     I        FUEL
                                                            If ice accumulation is suspected:
                                                                                                      L
                                                            Landing with Ice Accumulation                      AAR
                                                            procedure........................... Accomplish
                              R WING OUTBD HEAT FAIL                                                 M
  SPEC                        The BA/ECS has detected that   Icing conditions........................... Avoid  ELEC
                              the right wing outboard ice                                             N
                              protection zone may not be    If failure is due to insuf¿cient bleed air
                              KHDWLQJ VXI¿FLHQWO\ WR UHPRYH   supply:                                          HYD
                              ice. The ice protection zone   HP...................................... As required  O
                              valve may be failed closed or
                              EOHHG DLU PD\ EH LQVXI¿FLHQW      Advance at least two engines to             FLT CTRL
                                                                minimum HP shown on the power         P
                                                                setting schedule in Chapter 12
                                                                (1,300 HP above 20,000 feet,
                                                                incrementally reducing the power      R       GEAR
                                                                by 100 HP every 5,000 feet until
                                                                reaching 5,000 feet where 750 HP
                                                                should be maintained).                S     DOR/RMP
  PERF                                                      Verify the ACAWS clears following the
                                                            next cycle (approximately 6 minutes).
                                                                                                      T     JETTISON
                                                            If ice accumulation is suspected:
                                                            Landing with Ice Accumulation             U
                                                            procedure........................... Accomplish  LANDING

                                                                                                      V
                                                                                                            DITCHING
                                                                                                     W
                                                                                                            BAILOUT
                                                                                                      X

  OPER                                                                                                      FAULT LG

                                                              -
                            Use, copying and/or disclosure is   175
                            governed by the statement on the
                            title page of this document.  BACK                                               CHARTS
   90   91   92   93   94   95   96   97   98   99   100