Nomination Recognition 2017


        Report by Cross Functional Team

       CATEGORY:         CROSS FUNCTIONAL TEAM AWARD

       PROJECT:          Wooster Tiger Team

       CATEGORY:        DOING WHAT IT TAKES

       NOMINATOR:       John Hooker
        functional ?Tiger Team? was quickly mobilized and was able to quickly identify a
        number of root cause issues that led to inventory accuracy and
        productivity/throughput issues at the Wooster facility.  These issues included:

        ?	Training issues generated by many new employees and related turnover
        ?	Multiple business processes that were not being followed or completed
        ?	Master data issues driven by the significant movements of customer shipping
        locations (Stow to Wooster and back in some cases) and pallet configurations
        driven by ASRS
        ?	Usage of floor space not originally intended to store fast moving inventory (and the
        subsequent system setup)
        ?	System processes that needed to be changed or adjusted to match new business
        processes



        The team mobilized initially for two weeks, and quickly accomplished the following:


        ?	Converted Buildings 66 and 72 from Inventory Management to Warehouse
        Management in SAP
        ?	Relabeled, reorganized inventory, and completed a full physical of Building 66 at
        Wooster
        ?	Completed an audit analysis of the ASRS system ? this led to maintenance of
        sensors in the equipment that were not reading the second pallet position in each
        ASRS location
        ?	Developed additional audit reports for DC personnel to use to identify issues within
        the ASRS equipment
        ?	Developed detailed metrics to track process transactional compliance and
        inventory accuracy
        ?	Increased cycle counting frequency
        ?	Added additional dock doors (essentially inventory locations) to building 73 to
        enable better tracking when receiving inventory
        ?	Reviewed all relevant master data, bin quantities, put-away strategies, and picking
        strategies
        ?	Reviewed and updated all relevant training documents
        ?	Re-trained Wooster shipping personnel

        Coming out of the two week sprint, it became apparent that despite some
        productivity improvement, a longer term effort was needed to continue to evaluate
        and resolve additional root cause issues.  The IT, Finance, and DC team members
        joined with OPEX resources so that a single, coordinated effort could go after these
        opportunities.