Page 24 - CSD - PUD 02 28 19
P. 24
Water Quality and Distribution Manager, March 2002 - July 2002
• Manage the daily activities of Pipeline Construction, Industrial Pretreatment, Water Quality, Re-
claimed Water System, and Laboratories.
Construction Project Manager May 2000 – March 2002
• Manage the design and construction of unit process modifications including: fluoride feed sys-
tem; powdered activated carbon delivery system; sedimentation basin rakes; filter valve re-
placement; scrubber design analysis and retrofit.
• Develop scope for major CIP projects including a 40 mgd Water Plant expansion
Wastewater Facilities Supervisor 1998- 2000
• Manage the Start-up and Operation of a 5.0-MGD Tertiary Activated Sludge Plant.
• Administer $2 million operating budget.
• Responsible for the Operation of an Aquifer Recharge Project.
Pretreatment Supervisor 1997 - 1998
• Administer the Federal Pretreatment Program, which involves permitting, monitoring, and in-
specting Significant Industrial Users including Intel, Motorola, and Microchip.
City of Mesa, AZ 1982 - 1995
Water Quality Supervisor, 1991 - 1995
• Implemented all Safe Drinking Water Act (SDWA) Regulations from 1982 - 1995.
• Negotiated Aquifer Protection Permits with the Arizona Department of Environmental Quality
for several treatment plants.
Water Quality Inspector, 1985 - 1991
• Responsible for water system sampling and compliance reporting for SDWA.
Water Quality Technician, 1982 - 1985
• Developed Arizona's first municipal Cross- Connection Control Program
Turner Ranches Water and Sanitation Company, Mesa, AZ 1979 - 1982
Assistant Chief Plant Operator
License: Registered Professional Engineer, State of Arizona
Grade 4 Wastewater Treatment Plant Operator, State of Arizona and State of New Mexico (ex-
pired)
Grade 4 Water Treatment Plant Operator, State of Arizona and State of New Mexico (expired)
University of Southern California FCC&HR Backflow Prevention Device Tester/Specialist