11.4.1  Printed SO
                         11.4.2  Gantt Chart
                         11.4.3  Node List
                         11.4.4  BOM list
                         11.4.5  List of tools/ Equipment / PPE (if any)
                         11.4.6  Floor plan with plotting / approved design by the client.

               12.IE SOP

                   12.1 Not allowed to touch the Database


               13.Logistic SOP

                          13.0.1  All items released by the warehouse should be delivered the same day.
                          13.0.2  Upon receiving of item from the warehouse, Logistic will be responsible in any
                                 losses it will occur during the shipment.
                          13.0.3  All Item for Delivery must be placed to Transit room.
                          13.0.4  GP Staff are not allowed to release the item without PAYMENT.
                          13.0.5  Must call to GP supervisor for any problem occurred on site.
                          13.0.6  GP Team should inform Sales / requesting person once the JOB has been done or if
                                 cannot make it on time.
                          13.0.7  All delivery must have DR and must be signed by the client.
                          13.0.8  DR must be distributed accordingly upon releasing of item. 1 for client, logistic,
                                 warehouse and accounting.

                     13.1  Vehicle

                          13.1.1  Driver must take and upload photo before and after the use of any Vehicle.
                          13.1.2  If any damages (dent, scratches, engine problem, etc…) found before you use the
                                 vehicle, and failure to report, the last person who use will be liable.

                     13.2  Man Lift Policies

                          13.2.1  Each Truck must always have 2 Drivers assigned, one for Dayshift and one for Night
                                 shift.
                          13.2.2  The Driver must make sure that the Truck is clean before he turns it over to the next
                                 shift. Clearance and Hazard lights must be checked if working. Brakes, oils, radiator
                                 water, and so on should be fully inspected and must report ANY FAULTS found to
                                 the IMMEDIATE SUPERVISOR or FMS, in case no supervisor is around.
                          13.2.3  The Driver is to be the Safety Man, doing the ground works as traffic regulation,
                                 assistance to the team, and monitoring the Man lift operation.
                          13.2.4  Each Infra Team should comprise ONLY of 1 Driver, 1 LM and 1 Installer. FT to be
                                 included in case of commissioning or Service Calls requiring laptop usage.