Page 59 - Barr&Barr_Technical Proposal
P. 59
2) Coordination Meetings b. Below 75’
a. DOB is expecting coordination meetings between the c. Above 75’
projects. f. Exterior Wall Phase
b. Coordination meetings shall be attended by the SSM g. Hoist Removal and Button Up Phase
of the Grad Hotel and the licensed Super of the EEC. h. Interior Phase
Documentation of these meetings shall be kept in their i. Roof/Pedestrian Protection Plan
respective logs. a. Existing Buildings and Walkways
c. Coordination meeting agenda should include the b. Adjacent Construction Site
evolving nature of the sites relative to one another j. Horizontal Nets Plan
and include planning for controlled access zones, hard k. Vertical Nets
fences, soft fences, and overhead protection. I. Shanty & Storage Plan
m. Typical Details
3) Site Safety Plans
a. Th e Site Safety Plan for the Graduate Hotel shall be Construction access and truck staging will be through North
zoomed out enough to understand the relationship Loop Road maintaining Emergency Vehicle at all times. As well
between the Graduate Hotel, the EEC, CUP, Tech as maintaining a minimum of 13’ clear between our construction
Walk and North Loop Rd. fence and the site seating of Bloomberg Center at the main
b. Th e Site Safety Plan shall have sections cut through entrance to Tech Walk for FDNY access. All deliveries would
the interface of the 2 projects showing requirements be scheduled at least 24 hours in advance. Major deliveries by
of overhead protection, fencing and controlled access Tractor Trailer, such as Steel, will require a fl agger.
from one to the other.
c. Th e Site Safety Plan shall be submitted assuming the Signage will be posted at all gate locations and a project sign
projects will be phased according to the best information will be provided. Specifi c signage with respect to spotter
regarding scheduling available at the time of submission. requirements and safety will be posted at the site entrances/
Notes can be placed on the SSP’s to allow fl exibility exits. (1-13’ Main Gate for vehicle access and 3 man-gates for
to make code compliant changes to the plan on site Pedestrian Egress) Additionally, Acoustic Blankets or “Echo
without resubmittal to BEST. Barriers” and Air Monitoring Stations will be added to the site
d. Changes to the SSP’s can be signed off on site by the fencing as shown in our Logistics Plans.
Site Safety Manager as long as the changes are code
compliant and they are not deemed as major alterations 8. Construction Approach
to the fi les plans. Preconstruction Phase
e. Although the EEC will not be required to fi le their Barr & Barr would look to continue our services through
own SSP, the DOB will enforce the coordination of 100% CD’s and fi nalize a GMC with Cornell University.
the EEC and the Graduate Hotel mutually through Our extensive knowledge and experience in estimating, value
the Graduate Hotels SSP. engineering, scheduling, local subcontractors, NYC DOB and
f. Th e Site Safety Plan for Excavation and Foundations FDNY requirements, EDC fi ling requirements makes Barr &
must be submitted before an FO permit is issued. Th e Barr a valuable member of the Cornell Team.
overall site safety plan must be submitted before the
NB permit is issued. Bidding Phase
Ultimately construction performance rests with the subcontractors
4) Separation and Protection and vendors who build the facility. Barr & Barr’s extensive
a. Hard fences (8’ Tall) and overhead protection are experiences in planning and managing the bid process will
required between both sites and the public pedestrians ensure the quality of construction. All of our subcontractors are
(Teck Walk and North Loop Rd}. prequalifi ed and evaluated based upon experience, fi nancials,
b. Soft fences (42” Tall} and controlled access zones can stability, accountability, business management, litigation, process
be used between the two project sites. and safety. We also factor into the process MWBE requirements
c. A 20’ long horizontal cantilever net can be used in of EDC to ensure that we are able to meet or exceed these goals.
lieu of a controlled access zone and will be enforced Our 50% CD schedule includes our procurement plan on how
if the controlled access zones are not satisfactory to we plan to package trade contractor work.
the DOB.
d. Proper separation of the projects from one another Construction Phase
is important for the DOB to assign violations to Barr & Barr will provide an experienced and well trained
one, without impacting the other. If the sites are not management team to properly supervise, monitor and coordinate
separated violations and stop work orders will apply the work of all subcontractors and vendors.
to both sites.
Site Management: Th e Barr & Barr team will manage all
Site safety plan expected drawing list conditions of the site work rules, including those required under
a. Notes & General Info NYC Site Management Plan developed for the Graduate Hotel.
b. Egress Plan
a. Pre-TCO Quality Control Plan: Th e Barr & Barr team will review all
b. Post-TCO submittals to assure compliance with the contract documents.
c. Excavation Phase Th e project superintendent will then verify the installed item
d. Foundation Phase is in compliance with the submittals and has been properly
e. Superstructure Phase
a. Crane Erection Phase